Font Size: a A A

Research On The Project Management Of L Power Company's Distributed Photovoltaic Power Generation

Posted on:2018-10-08Degree:MasterType:Thesis
Country:ChinaCandidate:F WangFull Text:PDF
GTID:2359330536460212Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Energy crisis is the inevitable product of rapid economic development,the resulting deterioration of the environment under the pressure to vigorously promote the needs of energy-saving emission reduction strategy,so that the development of solar energy,wind energy and other renewable energy has become a social development to the current stage of the inevitable requirement.Photovoltaic power generation projects with low-carbon,low noise,wide range of applications favored,and distributed photovoltaic power generation project is due to the unique advantages of distribution,has become an important way of new energy applications.Different from the traditional power generation projects,distributed photovoltaic power generation projects due to the management of the main body,long management chain and other reasons,increasing the difficulty of management,then affecting the project operation safety and management efficiency.This paper takes the distributed photovoltaic power generation project of L power supply company as the research object.Firstly,on the basis of summing up and applying the theory and method of project management and combining with the uniqueness of photovoltaic power generation project,the paper puts forward the project management tools and methods for distributed photovoltaic power generation;Secondly,combined with the current management system and practice of L power company's photovoltaic power generation project management,this paper analyzes the problems of the same line loss management,distribution network security management,information collection and management,fund settlement management and so on in the distributed photovoltaic power generation management,Elaborated the above four aspects of the problems and the reasons for its formation;Then,according to the actual situation of L power supply company,the concept and method of project management are used to put forward the general idea and concrete measures of project management improvement for the four aspects mentioned above;Finally,take the Daning County power supply company as an example,the proposed corrective measures were verified.It is found that the relevant management process of L power supply company does not fully consider the particularity of distributed photovoltaic power generation.The information interchange between different subjects and departments in project management is low and the difficulty of coordination is the important reason that the project management efficiency is unsatisfactory.In order to improve the efficiency of project management,L power supply company should focus on the project management of the main body coordination mechanism on the basis of this on the basis of the corresponding management model and business process optimization.Specific management strategies can be adopted,including the establishment of joint sector mechanism to build a new line loss management model,to promote the construction of energy information collection system,to carry out the integration of business management.Based on the operation experiment of Daning County Power Supply Company,the feasibility and effectiveness of these optimization strategies are also verified.
Keywords/Search Tags:Distributed, Photovoltaic power generation, Grid enterprise, Project management
PDF Full Text Request
Related items