Font Size: a A A

Study On Mode Of 500kV Operation Management Of Zhejiang Power Grid On Big Overhaul System

Posted on:2018-07-19Degree:MasterType:Thesis
Country:ChinaCandidate:X H XuFull Text:PDF
GTID:2359330518455519Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the State Grid C orporation of C hina(SGCC)"three intensive and five" strategic system construc tion to promote.According to the " three intensive and five " strategy system requirements,Zhejiang Electric Power C ompany actively implements the strategy of SGCC and Inspection & Maintenance Company is founded by concentrating of Zhejiang province 500 k V substation operation management of resources,the formation of the Zhejiang Electric Power Corporation and ma intenance branch company,which is in-depth reforming of Zhejiang power grid 500 k V substation operation management mode.Though breaking the tradit iona l management pattern of the 500 k V substation,taking zhe 500 k V unmanned substation for the direction of development,the company divided reasonably the scope of the operation and maintenance of the station.At the same time to strengthen the equip ment life cycle management,improve the reliability of power supply as the main line,the imp lementation of business operation and ma intenance management mode of production integration,enhance the production effic iency and effectiveness,to implement the relevant requirements of the maintenance system.In this paper,the relevant requirements set up Zhejiang Electric Power Corporation ma intenance branch and princip le as the starting point,through the analysis of the Zhejiang Electric Power C orporation maintenance company external environment,internal resources and strategic objectives,closely around the strategic goal of company "a strong three excellent",basing on the theory of organization design,with new technology to support grid,through the diagnosis of pre reform related organization mode analysis,put forward to form a maintenance company and organization reform goal.At the same time,by analyzing the shortcomings of the tradit ional mode of operation and management of 500 kV Substation of Zhejiang power grid.The organization mode and re design Zhejiang Electric Power Corporation maintenance branch,which avo ided the tradit ional way of operation and management of the problem.The overall design of ne w corporation is closely around the development strategy of the SGCC,considering the maintenance branch of the future direction of development,scale,technology and human resources etc.providing a few years of relatively stable and practical platform for the development of new corporation.
Keywords/Search Tags:big overhaul, substation operation, organizational change, Management mode
PDF Full Text Request
Related items