Font Size: a A A

Research On Risk Management Of Shougang Steel Processing Center In Tianjin

Posted on:2014-12-12Degree:MasterType:Thesis
Country:ChinaCandidate:P ZhaoFull Text:PDF
GTID:2359330512471462Subject:Project management
Abstract/Summary:PDF Full Text Request
In order to keep up with the increasing competition of domestic steel industry,to steer product structure previously dominated by long steel to high-quality sheet,thus build high-sufficient sheet marketing system.According to Shougang's strategic marketing outlook and the demand of strategic planning of processing and distribution.Under this circumstance,Shougang Corporation intends to bulid a processing center in Tianjin Airport Logistic and Industrial Park.With the rapid development of modern logistics,Customers like automotive,home appliance,have even higher expectation to more personalized service,cutting,processing,suitable package and distribution have become the main mode of cold-rolled product sales for large-scale circulator.It has become the frontier service platform of Steel plants' extension of industrial chain.Therefore,building a steel processing center in Tianjin is the necessary way to both cater for automobile plants,home appliances and other end customers,and to boost core market share thus achieving marketing goals.Building Shougang steel processing center as a case,the paper first explained the basic theory of project risk management,then utilize theory and methodology of project risk management to fully investigate the steel processing center project.The analysis and investigation make it possible to find an effective risk control system for this project and similar ones,and reasonable risk control methods to ensure that the project safely and reliably implemented,reducing various risks encountered and successfully achieve the desired construction goals.Summarizing the risks involved in project implementation,identifying problems,to establish risk prevention and control system,thus conceive reasonable risk management planning.Investigation on project risk management,can not only be applied to the Tianjin project risk,but also accumulate valuable experience for the construction of steel processing center,thus providing models and reference for other project in the era of greatly emphasizing processing and distribution.
Keywords/Search Tags:Shougang, Steel proessing center, Risk management, Risk identification
PDF Full Text Request
Related items