| With the development of society and economy,more and more high-rise buildings,the traditional water pump system is at risk secondary pollution,the urgent need for a stable and efficient secondary water supply system for high-rise residential design.secondary water supply system water supply system is an important part of the community,including secondary water supply pumping station construction is the priority among priorities,pumping station construction and maintenance standards do not meet the requirements,there will be pressure instability,water turbidity,low velocity and other phenomena,these problems will seriously affect the entire district residents water safety and threat their healthy.Since the establishment of the Xiangcheng District in 2001,high-rise residential area from the construction area is almost zero,increased to 1 million square meters now,the monthly increase in the amount of water supply from zero to 900 thousand tons/month on the secondary.According to the Xiangcheng District old district and the New District in the secondary water supply project construction whole process analysis,from the beginning to the construction,equipment installation,pipeline approach,software programming,debugging equipment,access control platform for all-round analysis.On this basis,according to the relevant standards,developed the "Suzhou secondary water supply project implementation details","Xiangcheng District.Effectively regulate the construction of secondary water supply projects in the region,to better meet the sustainability of social and economic development in Xiangcheng District. |