Font Size: a A A

Design And Implementation Of Site Commissioning Subsystem In Power Supply Information Collection Platform

Posted on:2018-07-16Degree:MasterType:Thesis
Country:ChinaCandidate:M Y WangFull Text:PDF
GTID:2348330542452514Subject:Engineering
Abstract/Summary:PDF Full Text Request
In recent years,the digital and automation level of the internal business management in domestic power supply companies has been significantly improved.Especially in the power supply data collection business system,the majority of power supply companies have basically achieved the data automated collection by relying on the data acquisition devices and equipment,smart meters and other hardware automatic acquisition,etc.It hase effectively improved overall quality and efficiency in the field of power supply data collection in power supply companies.However,the domestic power supply company's acquisition equipment and equipment debugging and maintenance work is still mainly rely on manual management mode currently.Therefore,the business efficiency is relatively low,and the real-time level is relatively poor.How to improve the level of automation of equipment is one of the important challenges faced by domestic power supply companies in the process of building intelligent grid.The Power Supply Information Acquisition Software Platform Field Debugging Subsystem of State Grid Nanchong Power Supply Company researched in this thesis could provide remote Power Supply Data Acquisition Equipment and equipment debugging function for grid debugging personnel.Therefore,it could solve the defects and problems that need to invest many work force and material resources in the traditional debugging work mode,and could effectively improve the automation and reliability level of power supply data collection work.The system uses the B/S Web network architecture,using Java Web development technology and SSM software framework for functional design and development,the background database using Oracle large database management system.In the research work,this thesis focuses on the analysis and investigation of the system needs analysis,functional design and implementation,system testing and other work,and organizes and introduces the related technologies in the system research and development work.The Power Supply Information Acquisition Software Platform Field Debugging Subsystem of State Grid Nanchong Power Supply Company researched in this thesis could provide remote Power Supply Data Acquisition Equipment and equipment debugging function for grid debugging personnel.So it could solve the defects and problems which need to invest a lot of manpower and material resources in the traditional debugging work mode,and could effectively improve the power supply data collection automation and reliability.The system uses the B/S Web network architecture,using Java Webdevelopment technology and SSM software framework for functional design and development,the background database using Oracle large database management system.In the research work,this thesis focuses on the analysis and investigation of the system needs,functional design and implementation,system-testing work.Moreover,this thesis organizes and introduces the related technologies in the system research and development work.In the design and implementation of the system,this thesis studies the functional model,network structure,communication interface and functional structure design of the whole system design work.Then analyzes the ER design and data table design in the database design,each function module is studied according to the system functional structure,and the class structure design and function realization process of each function module are studied.In the test and analysis of the system,this paper studies the test environment and deployment,test method and content of the system test work,and makes a detailed test and analysis of the functional performance and performance of the system through the design of functional test cases and performance test cases.The system contains the command issued,data acquisition,parameter settings and basic information management functional modules,which could provide acquisition equipment and debugging equipment,remote debugging management function for the grid commissioning workers in the power supply company's internal network environment and power supply data acquisition and communication environment.Therefore,the system can improve the quality and efficiency of equipment debugging in State Grid Nanchong Power Supply Company.In addition,the system can effectively improve the company in the field of power supply data acquisition automation and intelligent level by coordinating with other functional components in the power supply information acquisition software.The research work of this thesis also has a certain degree of promotion and reference value for the efficiency improving of other parts of the domestic power supply company's power supply data acquisition equipment debugging automation level...
Keywords/Search Tags:Power Supply Company, Data Acquisition, Field Debugging, SSM Development
PDF Full Text Request
Related items