Font Size: a A A

Mining Engineering Plan Design And Implementation Of Dynamic Management System

Posted on:2016-10-20Degree:MasterType:Thesis
Country:ChinaCandidate:H Q ZhangFull Text:PDF
GTID:2348330512474930Subject:Software engineering
Abstract/Summary:PDF Full Text Request
From the beginning of 2013,into the global coal market "winter",although coal prices continue to decline,but sales is still not optimistic.Especially my province coal mine low calorie coal deposit is serious,the need for more than.With the development of artificial cost is more and more high,the greater risk of mining,the coal enterprises will face enormous pressure of hitherto unknown.How to use existing resources more efficiently,to save the maximum cost become inevitable issues.Under conditions of hard and dangerous,the miners have become young generation is not willing to choose the type of work,so how to improve the efficiency in the technology,increase production capacity is an urgent problem to be solved.The dynamic management system of mining engineering plan is developed in these many demand a application software based on Windows operating system,the effective solution,mining work plans for each of our coal mine enterprises,mining engineering design,planar graph mapping,modify and complement graph management management level is low,the effect is poor,backward drawings.In the production of a serious problem of underground work efficiency is low.The system can completely solve the problem of dynamic management in mining engineering plan production of coal mine in China,provide technical guarantee for the modernization of coal mine production technology management.This project comes from the center of a coal enterprise application project geology,is based on the Windows operating system of coal mining engineering development.I according to analysis and technical feasibility of mining engineering plan for dynamic management of customer demand analysis,through interactive design,detailed design,code realization and software testing stage,completed the design and development of dynamic management system of mining engineering plan,has realized the system database management of mining data and measured data,the database is automatically added,modify,delete and query function,the system can carry out mining engineering design in mining engineering plan,support the graphical management system function is strong(can realize drawing roaming,move,zoom,edit,modify,multiple functions,annotation and a variety of different proportion of graphics processing);system is open,users according to the needs of their own to modify and extend the system.Firstly this paper expounds research background and significance of the project related technology is briefly introduced,then the dynamic management system of mining engineering plan analyzed the demand analysis and business,then introduces the system design of dynamic management system for mining engineering plan.
Keywords/Search Tags:Coal mining, Geological drawing, Engineering plan, Dynamic management, AutoCAD 2007
PDF Full Text Request
Related items