Research On Quality Management Of Heavy Haul Road Engineering Project In Logistic Park A

Posted on:2018-07-05Degree:MasterType:Thesis
Country:ChinaCandidate:S M ZouFull Text:PDF
GTID:2322330542478100Subject:Engineering
Abstract/Summary:PDF Full Text Request
The application of project quality management theory,based on the current status of the project quality management both at home and abroad,aiming at the logistics park A heavy road project,to explore the suitable method of quality management mode of China’s logistics park heavy road construction project management and operational and effective engineering project.The main contents and conclusions are as follows:First of all,investigate the logistics park A heavy load road project overview and project features,including the project overview,project construction objectives,project construction guidelines,construction overall plan,project schedule and management,project focus,difficult project construction organization.Through the investigation,the logistics park A heavy road engineering project quality requirements are strict,the main sub project quality reached the qualified level,the unit project qualification rate is 100%.Project engineering workload is huge,the construction period is tight,and the difficulty is big and so on.Secondly,according to the characteristics of the logistics park A heavy-duty road project,the implementation of the project quality management measures,completes the project quality management plan,determine the project quality management policy:-to ISO9002 quality management system standards for guidance,conscientiously implement the national quality policy.The project quality target is the main sub project quality,reaching the qualified grade of "acceptance standard for construction quality of urban road engineering"(DBJ50300-078-2008),and the qualified rate of unit project is 100%.And set up a project manager for the head of the chief engineer and production manager for the deputy head of safety and quality department,engineering department,technical department,material and equipment department is responsible for the human crew project quality management system of organization,under each work team set up the project quality part-time quality inspector organization,management of project quality.And formulate quality management system,such as project quality regular meeting system,quality responsibility system,quality inspection system,etc..Again,according to the current provisions of ISO9002:2008 quality assurance system standards,the creation of project quality assurance system,quality assurance project related work,including the organization guarantee measures,education guarantee measures,technical management measures,construction measures,organization and coordination of guarantee measures,and refinement of the quality assurance system,the establishment of the quality the project quality assurance measures,equipment and materials quality assurance measures and construction method of main guarantee measures.Finally,according to the whole life cycle quality management theory,according to the content and characteristics of the project,according to the quality manual and procedure document,the quality control of the A heavy haul road project construction plan stage,construction process stage and construction quality is carried out.The whole process engineering is tested and the quality inspection procedure is worked out,so that each quality factor in the construction process can be effectively controlled and operated.In this paper,according to the characteristics of the project,the use of relevant quality management technology and theory,the quality of the project needs for detailed analysis,for similar projects to provide reference for quality management,has a certain significance.
Keywords/Search Tags:Logistics Park, heavy haul road project, project quality management, whole process quality management
PDF Full Text Request
Related items