Font Size: a A A

Study On The Bidding Management Of Construction Dewration Works In Chen Zhou

Posted on:2018-05-22Degree:MasterType:Thesis
Country:ChinaCandidate:M H KuangFull Text:PDF
GTID:2322330542471457Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
In our country,the vast majority of construction engineering trading would be able to achieve,through tendering and bidding process in accordance with the law,by the build of public resources trading center of the platform.Decoration is an integral part of the construction,it with characteristics of varied materials,flexible construction methods,complex technology and strong artistic effect.Don't award without qualification of decoration company,the applicable scope of the need for bidding,who reached work item bidding in our country.It need to strengthen the bidding management of decoration projects and regulate the decoration market transactions,as expansion of the decoration industry and the rapid growth of decoration companies.This article mainly from bidding management of building decoration project with social problems in Chenzhou,find out the countermeasure and analysis,in order to the decoration project bidding management improved and promoted,and ordered development of building decoration market.Through the tender,The tenderer chooses the bidder with construction project,can save investment,reduce costs and shorten the time limit for a project,to ensure the quality of projects,promote the national economy or financial economic benefits.For bidders,they can compete for the engineering project through bidding,and stand out from the hand of competes getting the engineering consulting contract,the construction technology,cost savings,play their expertise,guardant the engineering payment,strength the awareness of social services so as to enhance the visibility of the enterprise,and wake profile,For bidding management institutions,it can strengthen.the bidding management of the construction decoration engineering project,reduce the cost of the bid more effectively,put an end to the bid rigging and collusion phenomenon,strengthen the construction of expert evaluation,perfect the system of locus and regulations,vigorously carry out the comprehensive evaluation method,and vigorously promote the valuation method,and improve the supervision of the bidding management system.The research is preferably to improve and enhance owe bidding management of construction decoration engineering project.The purpose is to safeguard the legitimate rights of live bidding activity,and ultimately save the cost,optimize the policy,promote the though,This study has some shorting,such as how the invitation units select bid openly,how the tender unit wake decisions of tender offer.All those problems weed further research and discussion.
Keywords/Search Tags:construction decoration works, decoration engineering bidding, bidding management, tender
PDF Full Text Request
Related items