Font Size: a A A

QiFu Nenjiang Bridge Engineering Management Measures And Methods Discussed In This Paper

Posted on:2018-07-11Degree:MasterType:Thesis
Country:ChinaCandidate:H B XieFull Text:PDF
GTID:2322330536485245Subject:Engineering
Abstract/Summary:PDF Full Text Request
Heilongjiang province was filled with high-speed Ji Gan(amaurosis bounded)Fu La Er Ji connecting nen river bridge and road engineering,bridge construction of bridge structure is complex,money is tight,short time limit for a project,construction task is heavy,high security risks.At the same time is located in the northeast,effective during construction period is short.The project is by the local government is responsible for the construction of the construction project,management experience is not rich,construction experience.According to these factors,this paper discusses the engineering management faces critical problem such as quality,safety,schedule,cost,and puts forward the measures and methods to solve these problems.Better paper through the analysis of the inhibitor with high-speed Ji Gan(amaurosis bounded)Fu La Er Ji connecting nen river bridge and the approach road project,deal with the difficulty in management,put forward "miho control"(quality,progress,safety,accused of money)for the construction of the management goal and "four service" as the management guidelines,namely "in the service of project management","in the service of the engineering quality," "in the service of the progress","in the service of engineering safety".Combination was filled with high-speed Ji Gan(amaurosis bounded)Fu La Er Ji connecting the characteristics of the nenjiang river bridge and the approach road project,establish a more suitable for the actual status of the project and the local scientific and reasonable project management system,completed the inhibitor with high-speed Ji Gan(amaurosis bounded)Fu La Er Ji connecting nen river bridge and the approach road project to build a safe,comfortable,high-speed transport corridor.Study in the project management system and quality management,schedule management,financial management,security management and integrity management measures and methods taken is to project management theory and combining the actual situation of flexible application,enrich the project management of specific measures,so it can be accepted and adopted by other project managers.Paper was full of high-speed Ji Gan(amaurosis bounded)Fu La Er Ji connecting nen river bridge and road engineering measures and management method,the extra large bridge project management work and so on also to have certain reference significance.
Keywords/Search Tags:engineering management, bridge engineering, project management, management experience, measures and methods
PDF Full Text Request
Related items