By the end of 2009, our existing buildings in the area has reached 430 billion M L,the reinforcement of building enclosure of transformation is a very difficult task, at the end of the 1990 s, the transformation of the building translation technology in China came into being. Through the transformation of the building, can make the history of the building and the building with continued use value to be protected, to avoid the fate of being removed.The city shift senior bank office building of the whole shift translation and top rising process combined with practical engineering are simulated and analyzed,systematically describes the design plan and main points of construction for building monolithic moving technology, mainly summarizes the support for the classification of the structure and its engineering application, and for urban and rural construction and renovation in the process of building integral translation scheme determination and implementation provides a basis for the theoretical analysis. The project with respect to the other domestic shift characteristics of engineering is the engineering in construction and larger quality; the main structure of frame- shear wall structure, forms the basis of the box foundation, and in the translocation process, in the original location of the pillar set embrace column hanger for, put at the bottom of the column load is transmitted to the lower rail beam; elevator shear wall under set deep underpinning, shear wall uniform line load is transmitted to the lower rail beam; hydraulic jack thrust traction mechanism, jack up as a sliding pivot. Similar projects in the country are relatively rare.The whole foundation of vertical displacement is the key of the construction process. In this paper, combined with the analysis results, the characteristics of the structure shift, the building displacement process and the building in place can be used as the monitoring parameters of the structure stress state, which provides a reference for the same kind of displacement Engineering. Analysis of the building in place after the foundation of the force, in order to be in place after the settlement and need to work in the position to provide reference for monitoring. Compared with the natural frequency and period of the structure before and after the shift, the modal parameters of the structure are very small, and the effect of the shift project on the building is very small.Comprehensive calculation and analysis results, the project of the shift scheme is more reasonable.Finally, on the basis of summing up the above research results, the paper puts forward suggestions on the design, construction and further research of the building integral translation technique. This paper can provide a theoretical reference for the actual shift construction process.
Keywords/Search Tags:Reinforcement and reconstruction, Monolithic moving, Measuring Parameters, Theoretical reference
PDF Full Text Request
Related items