Font Size: a A A

Establishment Of Oil Pre-drilling Engineering Road Indicator System And Anti-spray Pit Modification

Posted on:2018-03-01Degree:MasterType:Thesis
Country:ChinaCandidate:Q XueFull Text:PDF
GTID:2322330521950875Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Drilling before the project is the name of oil and gas exploration and development of pre-engineering.Oil and gas industry is an important pillar of the national economy.In the whole country under the care and support,the rapid rise of China's oil and gas industryWith the progress of social developemt, applications of pre-drilling project are more wide.At the same time, pre-drilling project has also received wide attention.Pre-drilling project is an important guarantee for the successful completion of the entire project and essential for construction.For now,pre-drilling project is the early stage of the project in oilfield exploration and development.And the construction of the road in pre-drilling project is the artery of the entire project.The construction of the road in pre-drilling project is an important job,and is not only related to whether the oil companies can work,but also to whether the cargo arrives conveniently.According to the information provided by Southwest Oil and Gas Field Branch,it describes the concept of highway design,including related factors of road design,graphic design specifications,profile design specifications,cross-sectional design specifications and roadbed and pavement design specifications.By analyzing and determining a series of technical indicatos,it formed applying to Southwest Oil and Gas Field Branch index system about road adaptability in pre-drilling project.In oil and gas exploration, sometimes encountered in the ground of the gas, then you need to use the way to release some of the combustible gas released to test the indicators of combustible gas,in order to carry out the late mining work.In order to ensure the safety of the discharge process,put the spray pit came into being. The research and modification of the anti-spray pit at the present stage are the main contents of this paper.
Keywords/Search Tags:Pre-drilling project, Road design, lndex system, Anti-spray pit
PDF Full Text Request
Related items