| With the rapid economic development of Inner Mongolia and Hohhot Railway Bureau Freight reform,railway passenger and freight transport and other modes of transportation increasingly fierce competition,in order to meet the market demand for transportation,railway transportation based on continuously upgrade the quality of service,the key is to shorten the delivery time of passenger train,increase the density and turnover time,improve travel and freight send passengers freight experience satisfaction.However,the transport organization of high density,high speed,high load is brought about by the serious loss of railway equipment,therefore,strengthen traffic equipment construction and maintenance is an important guarantee for the safety of railway transportation unimpeded,and construction and maintenance plan management is the basis of maintenance work of construction equipment is driving,driving and directing the construction organization plan on the basis of the operation,and the Hohhot Railway Bureau,the existing construction maintenance plan management is relatively inefficient,so it is important to establish a efficient construction maintenance management mode.According to the Hohhot Railway Bureau Traffic Equipment Management,inspection and maintenance of construction three in both construction and maintenance management,and the corresponding construction maintenance planning,implementation and evaluation of the three in one construction and maintenance plan management,organization,preparation of current bull management,preparation and implementation of plans do not have the scientific nature planning and approval procedures,complex,low utilization rate,construction plan,construction unit maintenance step to upgrade equipment maintenance team quality,update is difficult,the lack of professional pipe inspection,planning and implementation of the quality problems such as lack of supervision mechanism is analyzed in detail the planning process,to repair three in one tube the construction and maintenance management and planning,implementation and evaluation of construction and maintenance plan management and the safety of railway transportation is one of the three requirements The adaptability of argumentation,and combined with the specific situation of administration and modern management organization theory,using the linear planning method,put forward the preliminary design construction maintenance plan management more efficient planning,implementation and evaluation of three separate,namely the equipment management unit is responsible for equipment management,equipment inspection and analysis,the state data collection construction and maintenance demand report,construction and maintenance of quality supervision and evaluation of equipment fault repair,professional construction and maintenance department is responsible for the construction and maintenance planning and implementation,so that it can meet the current needs of the maintenance of railway construction.Through the study on Optimization of plan management construction and maintenance,to improve the railway construction and maintenance plan management status,solve the construction and maintenance of train operation organization contradictions and shortcomings for construction and maintenance plan management put forward based scheme,also put forward the preliminary plan for the depth change management method of railway construction and maintenance. |