Font Size: a A A

Chaoyang District Preventing Electricity-stolen Method And The Design And Implementation Of Intelligent Watt-hour Meter Box

Posted on:2018-03-31Degree:MasterType:Thesis
Country:ChinaCandidate:M Y ZhangFull Text:PDF
GTID:2322330518961447Subject:Engineering
Abstract/Summary:PDF Full Text Request
This article introduced the Chaoyang area current steals the electrical condition and steals the electricity behavior the influence which brings to the society.At present,National Electrical network Company already started to attempt the construction intelligence electrical network correspondence,carried on the transformation to our country's transmission system,develops may the automatic table look-up system,and had to develop the demand side management technology.In this process,our country very much regards as important generally for the electrical power distribution system to the electric instrument management,but does not have to be able actually to the electric instrument box realization real-time examination,simultaneously has also neglected the supervisory work.Also has done “the entire gathering,entire Fei Kong,can cover” the work along with National Electrical network Company,as well as copied the table,urges to spend “double does not have” the management pattern,the traditional electric instrument box already does not have the means to meet the needs,therefore had to have widely to carry out one kind of intelligent electric instrument in our country.The traditional electric instrument box thoroughly is replaced,installment intelligence new electric instrument box imperative.This topic main research designs one kind of intelligent table box,the imagery processing technology,the GPS localization technology,the intelligent examination analysis technology and so on many kinds of function technology fuses formidable in together.Through to the electrical power system actual need investigation and study,draws up the belt to guard against steals the ornamental lighting letter alarm device the design,according to the GSM/GPRS communication protocol,the realization intelligence electric instrument data communication,selects again has each kind of function detector,the realization steals the electricity behavior recognition and the photograph start.Through to the connection module research,realizes each kind of picture,information processing,the memory as well as the color letter reports to the police the function.After completes the software and hardware the design,reasonable various parts assembles in together.It can in the real-time examination low pressure electric instrument box condition and the table box movement situations and so on electrical energy table,switch,protection device,monitoring equipment,detector set,has the leakage protection reminder function,when has steals the electricity occurs can the online monitor report to the police,functions and so on GPS localization and breakdown auto-alarm,realize to the electric instrument box movement process intellectualization online monitoring and the management goal.
Keywords/Search Tags:The smart grid, Preventing electricity-stolen, Meter box, MMS alarm
PDF Full Text Request
Related items