| In recent years,domestic high-rise buildings emerge in endlessly due to the rapid economic development,there also appeared a variety of relatively new scaffolding system.Although the scaffolding is a temporary structure outside the building,But it have a vital role in the construction,Especially for the progress of the time limit for a project and the influence of the control of economic benefits.Traditional scaffold materials were wood,bamboo,steel pipes,new scaffold material are aluminum alloy plate and steel plate.After comparing the indicators,Adhesive lifting scaffolding stands out for its easy installation and disassembly,easy maintenance,fire protection,beautiful shape,significant cost savings,climbing scaffold platform which provide laborer with the working environment,avoid high falling objects.Adhesive lifting scaffolding is more and more widely used in tall building as a result.this paper is based on the project of ShanDong Min Ying Keji Mansion,Expounds the project adhesive lifting scaffolding system design scheme,it is concluded that the optimized design of adhesive lifting scaffolding,The Intelligent Lift Platform Construction Methods of High-rise Building.Optimized method is expounded from the design of high-rise construction lift platform to the installation of the lift platform,the special processing of the key positions.Calculate and check calculation through the high-rise construction design specification of and scaffold design specification.In the process of calculation,emphasizing on the high-rise construction lift platform node connection mode,stress analysis support system,deflection calculation of the components bearing capacity.Provide reliable theory basis to the subsequent lift platform construction of high-rise building project. |