The Study Of Project Management About The SPGC Project Of ZHD Company

Posted on:2016-12-03Degree:MasterType:Thesis
Country:ChinaCandidate:Y Y TaiFull Text:PDF
GTID:2322330482467661Subject:Project management
Abstract/Summary:PDF Full Text Request
ZHD co., LTD. is a construction enterprise, the company contracted SPGC project in staff, quality and safety management. SPGC project consists of civil engineering, installation, municipal gardens etc. Comprehensive engineering; SPGC project in the whole management process using a lot of the typical management method, comprehensive analysis and research of the project management, this paper has good practical significance.In this paper, the author using the general theory of project management to ZHD SPGC project management core capacity analysis and research, and puts forward the countermeasures. This paper consists of three parts, the first part is the content of the first chapter for the project background, research status at home and abroad and the main research content; The second part is the second chapter and the third chapter, the content general theory and model for project management and further study of SPGC problems existing in the project. The third part is chapter 4 and chapter 5, the integrated use of related theory, the problems existed in the system, associated control, find the problem causes and in combination with the practical features of the project, puts forward a corresponding scientific and reasonable countermeasure and safeguard measures, such as improving performance appraisal system, strengthen the safety and quality management, citing industry the latest technology to promote and solve the problems existing in the management. This paper mainly analysis the project management, quality and security. Project personnel and organizational structure part involves the whole process of project management, also is the key to the project can run smoothly, and the quality and safety management is quite strong typicality, personnel how to implement the safety and quality management, safety and quality management of the impact on the schedule and cost problems will be as a narrative points of this paper. The project schedule and cost management as the paper content., File management, contract management and other unrepresentative, therefore is beyond the scope of this study.To sum up, this article through to the SPGC in-depth study of the project, the personnel management, quality management, safety management existence question has carried on the analysis, and put forward the relevant Suggestions and countermeasures to solve the problem and the safeguard measures, hope to be able to summarize the project, and the related project provides referential experience and basis.
Keywords/Search Tags:safety, progress, quality, personnel management
PDF Full Text Request
Related items