The Saertu reservoir has been mining for 37 years,has been in the high water cut stage mining.Our case to the north of two Northeast Three Eastern block,according to the existing centralized management difficult phenomena are discussed,has carried on the elaboration from ground equipment and management mode and the underground pipe column damage etc..This paper analyzes the management mode of single set discussed several methods of pumping and rationalization of the system,from the management of equipment in packing,rod and tube equipment are discussed in this paper,a breakthrough in oil saving cost management mode. |