Font Size: a A A

Two Kinds Foundation Modular Technology Of Ancillary Equipment Preliminary Work For Drilling

Posted on:2017-11-24Degree:MasterType:Thesis
Country:ChinaCandidate:F X ZhangFull Text:PDF
GTID:2311330485956603Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Great speed in o il drilling, before drilling works year after year to shorten the durat ion of the background of the require ments under the drilling ancillary facilit ies based in tradit iona l local materia ls masonr y or concrete pouring of t he tradit io nal process, to build facilit ies, since the conve nt iona l process steps more than the construct ion period long, can not meet the owners of the construct ion period before drilling engineering increa singly shorter require ments.In this paper, to carry out "be fore drilling engineering research effic ient modular construct ion technolo gy" for drilling ancillar y facilit ies proposed based modular, standard ized, large- scale production technolo gy and standard ized assemb ly techno logy. Under certain strengt h, durabilit y and stabilit y cond it ions, shorten the construct ion period, improve construct ion e fficie ncy, save construct ion invest ment, protect the ecologica l enviro nment.In this paper, respective ly, before d rilling engineering anc illary equip ment in C lass 2 devices have more features(strip foundation c lass equipme nt and mud reserve tank device) design t he appropriate assemb ly Foundation: str ip foundation c lass equipme nt and modular base mud reservoir tank fo undatio n. Paper discusses two basic prefabr icated modular design process, inc lud ing basic selection, module design, mater ial test ing, checking soft ware, and on-s ite tests and so on. In this paper, fabricated foundat ion construct ion process design are described. Fina lly, the chapter on the basis of fabricated and tradit iona l basis of a comparative analys is separately from t he technica l, economic, and environme ntal protection. By comparing the data base will be fabricated modular, standardizatio n, environmenta l protection advantages, more intuit ive displa y.To carry out "pre- drilling Engineering Research modular construct ion and effic ient techno logy", to improve the effic iency of constructio n projects before drilling, breaking years before drilling constructio n period of extreme tension in this bottle neck has milestone significance, but also provide strong support for the drilling speed.
Keywords/Search Tags:Petroleum Engineering, Preliminary work for drilling, Anc illary equip ment, Prefabricated foundation
PDF Full Text Request
Related items