Font Size: a A A

Study On Project Simulation Sharing Holding System In SJJS Group Co., LTD

Posted on:2016-10-02Degree:MasterType:Thesis
Country:ChinaCandidate:N C MaoFull Text:PDF
GTID:2309330482976188Subject:Executive MBA
Abstract/Summary:PDF Full Text Request
With the increasingly development of information technology, global economic integration step by step speeding up, the enterprise facing the market more competitive, especially large state-owned construction enterprise, face more severe challenges. Out how to make large state-owned construction enterprises, enhance the market competitiveness of enterprises, is a serious problem of state-owned enterprise is unable to avoid. Simulated joint stock system in the construction project, has realized in the enterprise management, enhance the enthusiasm of the employees, improve the economic benefit of enterprise, has become a large state-owned construction enterprises has important way to realize the management innovation.Based on SJJS group company as an example, this paper analyzes the SJJS group co., LTD. The problems in project management, and project simulation of SJJS group company share-holding system scheme design, is to realize the innovation of management system reform of state-owned construction enterprises. First of all, through analyzing the background of the construction industry, as well as the management confusion, facing the SJJS group proposed the project simulation joint-stock research significance and the train of thought and method, and through the analysis of the simulation of the shareholding system related theory, to simulate shareholding in provides the theory basis for the application of the construction project; Second, through the analysis about the present situation of SJJS group co., LTD. Simulation of the shareholding system implementation, find out the existing problems and the reasons of the problems, and on this basis, design the SJJS group company stock solution project simulation, and the project department implements the simulation of the joint stock system construction are analyzed, taking place in its 618 project as an example, to verify the implementation of the project simulation joint-stock enterprise economic and social benefits. Finally, from the perfect simulation stock preparation, the profit targets centered on the implementation of economic responsibility appraisal participation and management concept, cultivating, set up a simulation of the shareholding system related supporting system four aspects proposed SJJS group company shall manage the project simulation joint-stock safeguards.This article takes the SJJS group co., LTD. Simulation of shareholding system project to carry on the empirical analysis, through in the actual project implementation simulated the effect of shareholding system, to confirm the implementation of the project simulation shareholding system, not only to realize the value of state-owned assets, and to maximize the interests of the state, the collective and individual. For related construction enterprises can provide a reference method, and provides reference for the management of state-owned construction enterprise innovation.
Keywords/Search Tags:Construction enterprises, Project Simulation Sharing Holding System, Incentive Mechanism
PDF Full Text Request
Related items