Font Size: a A A

Research On The Risk Management Of The Construction Project Of EPC In Huashan, Ji’nan

Posted on:2016-04-10Degree:MasterType:Thesis
Country:ChinaCandidate:Z H YuFull Text:PDF
GTID:2309330482464828Subject:Project management
Abstract/Summary:PDF Full Text Request
This paper studies the government on behalf of affordable housing construction project risk management issues in the development process of EPC mode. Currently, the government-subsidized housing projects as the expansion of domestic demand and promote economic growth and an important primary measures to promote livelihood projects. But as a real estate development company for the development of affordable housing research is still at a preliminary stage risk. Real estate companies in the process of construction of affordable housing can only be based on past experience in real estate development and construction process to prevent the accumulation of similar risks associated, and then compared with ordinary commercial housing, affordable housing in the planning and design, architectural requirements, etc. They are special, past experience can not completely guide the development and construction of affordable housing. The purpose of this study are:the study of affordable housing construction project on behalf of EPC model risk, analyze the impact of affordable housing on behalf of the construction process of the main risks, proposed risk response measures to achieve the next generation of EPC mode of affordable housing built in the whole process Risk Management.In this paper, by way of example Jinan Huashan EPC generation of affordable housing construction project analysis, project risk estimate made at the beginning: The main use of breakeven method to calculate the profitability of the project and program selection, expert scoring method in accordance with the project development stage analysis project might encounter types of risk, risk development and construction of affordable housing in all aspects of the implementation of the identification papers carefully studied the background Jinan Huashan EPC Generation construction of affordable housing projects, content, on the basis of characteristics, summed up the security room EPC Jinan Huashan the risk characteristics of the agent construction projects, detailed in-depth analysis and identification of various external risks and internal risks that exist in the project, using the risk matrix method based on risk assessment theory to assess the specific risk factors for the project, while according to the project the actual situation is designed matrix model, thereby assess the probability of the risk factors for the emergence of the project, and according to their size and the probability of occurrence of risk to determine their risk level.Then from Jinan Huashan EPC Generation construction of affordable housing projects specific characteristics of view, feasible to develop preventive measures for each risk factor based on previously determined level of risk, a real risk of the entire project. Finally the item on its proposed effective risk management countermeasures and monitoring methods.
Keywords/Search Tags:affordable housing, construction project EPC, Generation Risk, Risk Management
PDF Full Text Request
Related items