Font Size: a A A

Research On The Economic Benefit Evaluation Of Product Oil Depot Construction Project In Dezhou South Service Area

Posted on:2015-08-16Degree:MasterType:Thesis
Country:ChinaCandidate:Y WangFull Text:PDF
GTID:2309330473454272Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, Shandong Province, stable and rapid economic growth, for several years the top three in the nation’s GDP growth rate is much higher than other provinces. Shandong Province developed transport network with traffic roads, highways, railways, waterways posed accessible. Rapid economic development and convenient transportation conditions, led to transport oil as the main oil consumption growth. Shandong Province is in the industrialization and urbanization accelerated phase, the rapid growth in energy demand. "Twelve Five" period, the amount of oil consumption is higher than the national average. At present, the total energy consumption in Shandong Province has been highest in the country, due to lack of resources and reserves of the province, the energy supply situation is very grim. In this context, the construction of the finished depot in south Texas service area in Shandong province has become very significance.The main purpose of this paper is to evaluate the economic benefits of the Southern District of Texas finished depot construction project. In this paper, the Texas oil depot construction project economic benefits of evaluate the finished service area south of the main line, made applicable to economic benefits of evaluate index finished depot construction project south Texas service area. In this paper, the main use of the AHP and fuzzy evaluation method, analysis and evaluate the project economic benefits of evaluation index system, basically reached the purpose of this study, for economic benefits of depot construction project provides a more scientific system methods.Firstly, the basic situation of the South Texas service area construction projects finished depot, depot construction project background and market demand are analyzed. Secondly, the project economic benefits of evaluation theory through the study of knowledge, the first of the South Texas service area product depot construction project financial analysis and evaluation. Finally, the South Texas service area product depot construction project economic benefits of evaluate carried out by the use of fuzzy evaluation method AHP- building project economic benefits of evaluation index system; on the basis of economic benefits of evaluation system, combined with the actual situation of the project, through questionnaires and expert scoring, the indicators derived weights and weight according to the weight of each indicator and evaluation score is calculated comprehensive evaluation of the results of the project economic benefits of, and the results were analyzed.
Keywords/Search Tags:Economic benefit evaluation, AHP, Finished product oil depot
PDF Full Text Request
Related items