Font Size: a A A

Feasibility Study On The Construction Of Hongqi 220kV Substation Of Chengde Electric Power Company

Posted on:2016-03-26Degree:MasterType:Thesis
Country:ChinaCandidate:S W XuFull Text:PDF
GTID:2309330470475714Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
The main function of substation is to connect with different voltage levels of power grid, complete the power conveying and assigned tasks through the transmission line. In recent years, the power load has increased steadily in most of the country. The grid has made a significant contribution to the regional economic and social development, at the same time, exposed many problems, such as the insufficient power supply capacity, the weak network structure, and so on.The feasibility study is a comprehensive and comprehensive study. It studies the necessity, the reliability, and the usefulness of the proposed project. Research is a basic way of the feasibility study, project is the object of the feasibility study, analysis and demonstration of ‘the three" is the main content of the feasibility study, to help decision-makers or decision-making departments to make the right decisions is the purpose of the feasibility study.Substation construction should adhere to the strategy of sustainable development of electric power industry, improve energy efficiency, and speed up technological innovation system, to ensure the safe and economic operation of power grid. The feasibility study is the main work before the project period; it can provide the basis in project decision-making and project loans for the power supply enterprise, it can provide the basis for the negotiation and signing of the contract or agreement, and it can provide a basis for engineering design, to avoid major mistakes in various aspects. It has a very great practical significance and research value.In this paper, on the basis of collecting a lot of data and information, combined with the actual work, we use several kinds of scientific research methods to lead the Feasibility Study on the Construction of Hongqi 220 kV Substation of Chengde Electri c Power Company,such as literature, research method, and comparative analysis and so on. First discussed the general situation of the engineering of substation, then make the selection of the transformer substation, make the planning of the transmission line path, then make the investment and cost analysis of the project, last get the conclusions of the feasibility study. It has a certain reference value to the feasibility study of 220 kV substation engineering.
Keywords/Search Tags:Power transmission project, transformer substation, feasibility study, engineering projection, investment estimation
PDF Full Text Request