| Scattered wood forest resources asset evaluation is an important component of forest resource assets evaluation, it based on forest resource asset condition in that part of the resources for the object, market prices, the replacement cost method, the expected monetary value judgments and other methods of forest resource assets. With the development of market economy, the State reform of collective forest right system, forest land exchange, forest land requisition and occupation, forest assets traded more frequently and so on, forest resource asset appraisal is very important. Chinese forestry system is market-oriented reforms, the collective forest rights transfer, requisitioned in forestry, wood market and other important parts. However there are still many problems in the process, improve the forest resource asset appraisal and management has become essential. This thesis in Shouyang Pine Cone hydropower station based on sporadic resources investigation, market prices, resetting cost and expected price evaluation method of forest resource, a preliminary assessment of the value of timber, Non timber forest crops and nursery stock, in the sporadic preliminary statistics on the basis of the value of wood, pine cone hydropower station statistics drown scattered wood in the construction of the initial value. Results showed that:(1) this times assessment according to assets assessment of fair, just, and objective of principles, according to existing market price, and cost heavy reset method, and expected returns expects price method on library district within sporadic wood forest resources for has assessment, assessment method properly, assessment price people willing to accept, assessment program legal, assessment content reasonable, in must degree Shang promote has pine Tower hydropower station of construction; (2) The assessment of forest resource assets verification using a survey method is mainly for sporadic distribution centralized, mass distribution of the genus, but ownership is complex, not using sampling methods. But the forest stock volume determination of standing tree volume table is based on the original data table, with the central area of the sample volume method calculate the volume of trees and produce tables. Full survey and sample phase combined of method makes pine Tower hydropower station sporadic wood forest resources assets of assessment more smooth; (3) this assessment developed of price standard used market price accounting mechanism and give corresponding of ecological compensation, and respectively for different species prepared assessment price table, in actual using in the more practical; (4) this assessment in the first in resources preliminary verification of based Shang points with material tree, seedlings and economic tree,three type for assessment, then respectively species prepared assessment price table, This assessment strategies and methods in a similar sign, changes in forest and other forest resource asset appraisal also apply; (5) the assessment investigated a total of 374490 scattered wood,66699 timber trees,267348 seedlings trees, 40443 economic trees, total compensation of 7521568 Yuan. Our assessment of the SongTa hydropower station building and laid the Foundation for the relocation of villagers, and features covers of forestry in related areas, forests and forest land forest resource assets evaluation has provided guidance in the process. |