The Research Of Tianjin Communications Company2014-2016Network Planning Project

Posted on:2016-08-29Degree:MasterType:Thesis
Country:ChinaCandidate:X J TangFull Text:PDF
GTID:2309330467997706Subject:Project planning and control
Abstract/Summary:PDF Full Text Request
Communication network planning as a communications company in the futurenetwork development, construction and technical development direction of lead,usually contains environmental analysis and business forecast, network constructionscale and the establishment of investment programs, and analysis of the internalfinancial indicators. So a scientific, reasonable and proactive network planning willbe a help for enterprise development takeoff.Tianjin communications network plan from2014to2016to implement thegroup company " Four network collaboration, The mobile Internet, The wholebusiness" of the three strategies, enterprise development needs, market developmentneeds, the technology development direction, in accordance with the "overallplanning, effective configuration, balanced development" principle, continue tostrengthen network core ability, improve resource use efficiency and value creationability. Through the network development goals, procedures, policies, and resourceallocation of scientific planning, unified planning, comprehensive coordination,support resource allocation decisions, support the network construction anddevelopment. At the same time is in the future, the strategic transition in inheritingand tianjin company indicate the development direction.Tianjin planning from2014to2016, including environmental and business,access network, transmission network, core network, network, supporting network,bureau of civil engineering, eight professional planning, investment performance andenergy conservation and emissions reduction, sharing two studies. Planning content atthe same time also includes four network collaboration, the whole business,intelligent pipeline, five focus on cloud computing and mobile Internet. So how toplan in the early stage of the project, middle and late and finishing period to realize the coordination between professional, especially in the planning period is short,shortage of personnel configuration under the condition of project managementbecome the core of this paper studies.First of all, this article in detail analyzes the communication company in tianjinin2014-2016network planning project cycle requirements, through the study of theelaboration of project cycle, after each stage of the project, divided into clearpersonnel required for each phase of the requirements, by combining the situation ofthe configuration of the project team personnel, put forward the scientific andreasonable personnel reuse plan, to solve the problem of insufficient project teampersonnel overall configuration.Secondly, this article in detail analyzes the communication company in tianjin in2014-2016network planning need to complete the main content of each phase, andthe detailed accounting team personnel need to take their workload, the sort, at thesame time, considering the professional, on the basis of similarity and correlationbetween professionals of reuse, solve the problem of insufficient overallconfiguration, the project team people realize the professional planning and researchcontent to share the load.This article in view of the tianjin communications company in2014-2016network planning project management study, designed to grope for a set of staffshortages, staffing uneven lead to team members work under the condition ofscientific, reasonable and efficient mode of project management, for the future similarplanning and project management to provide strong support and guarantee.
Keywords/Search Tags:Planning cycle, The personnel allocation, project management, reasonable reuse
PDF Full Text Request
Related items