Font Size: a A A

The Second-term Engineering Project Pre-evaluation For Shenyang Foundry And Forging Industry Co.,Ltd

Posted on:2015-06-04Degree:MasterType:Thesis
Country:ChinaCandidate:K Y LouFull Text:PDF
GTID:2309330467985469Subject:Project management
Abstract/Summary:PDF Full Text Request
The essay is regarding to the second-term engineering construction project pre-evaluation and study for Shenyang foundry and forging industry co.,Ltd. The construction of the project will improve market competition advantage of Shenyang foundry and forging industry co.,Ltd.Further more, it can accelerate transformation and updating for enterprise and products, functioning the first-term project pre-investment factory premises and infrastructure effectively, and serve for the prosperity of traditional-industry-base in Northeast of China better than before.During investment analysis and decision making process, the pre-evaluation study of the project is very significant and useful, it supplies direct evidences for the project’s investment decision making. The thesis primarily states background of the selecting topic and current research situation domestic and overseas, enforcing systematic analysis for the theory, method and content of the project’s pre-evaluation; Base on the current situation and development plan of Shenyang foundry and forging industry co.,Ltd. to discuss the necessity of project construction; narrating why choosing core equipments8000t swager,80t electric furnace,150t finery and so forth as core project; systematic analyzing estimated investment for the project, also analyzing project’s economic benefit and sensibility elaborately; by multi-angel evaluated project risk, economic and social influence comprehensively; Finally, the conclusion is that the second-term engineering construction project pre-evaluation and study for Shenyang foundry and forging industry co.,Ltd. is necessary, reasonable and feasible.
Keywords/Search Tags:8000t hydraulic forging, project pre-evaluation, economic evaluation, investment estimation
PDF Full Text Request
Related items