Font Size: a A A

Research On Compiling Work Instruction Of Tender Sum Limit Of Logistics Warehousing Center

Posted on:2015-06-12Degree:MasterType:Thesis
Country:ChinaCandidate:X C JiFull Text:PDF
GTID:2309330467955329Subject:Logistics Engineering
Abstract/Summary:PDF Full Text Request
With the issuance and implementation of Code of Valuation with Bill Quanitiy ofConstruction Works (GB50500-2013), the manadatory compliation of tender sum limit hasbeen strengthed, and the mode of bill quantity of construction has exerted a prominentinfluence upon “market” and “price”. The planning and designing level of Logisticswarehousing center has been gradually facilitated, which therefore calls foe an ever increasingbuilding demands for this kind of project.However as bidders pay inadequate attention to the compiled tender sum limit,and scientific or reasonable instruction methods, some improper cases like tconspired biding,biding price jacking or imbalanced quotation, and “setting at higher price while bidding atlower price” may pop up frequently. Bidders, constrained by an insufficient knowledge baseof action mechanism and relevant theories on tender sum limit, may have anunderperformance of combining project features and relevant enconomicis the theories withthose reasonable compiling method. In this concern, this paper mainly on the subject oflogistics warehousing center projects, discusses and researches the complication of tendersum limit on this kind of project, discusses and researches the complication of tender sumlimit on this kind of project, tender sum limit on this kind of project, which intends to injecteffective investment control while maximizing the excepted utilization of both contractissuing party and contractor. The research mainly includes the following parts:Firstly, it is based on the tender sum limit creation and development analysis offundamental bidding principles. Although many scholars conclude that the creation of tendersum limit intends to resolve such issues as together-conspired biding or bidding price jacking,triggered by “bidding without base price” and “biding with base price” respectively, there stillremains uncertain about reasonably explaining its profound causes from the perspective ofsociology and economics. This paper bases on bidding basic principles, analyzes the effect oftender sum limit and specifies its meaning from the perspective of sociology and economics.The creation of tender sum limit contributes to an orderly competition mode that features“Government guides the price, enterprise offers the price and market forms the price”, whichin essence has an influence of standardizing the competition and improving the marketeconomy.Secondly, it analyzes the interrelationship of all related factors in construction works.Oriented at the effect of tender sum limit, this paper makes a correlation analysis of mainrelevant factors in construction works, namely contract-issuer, contractor and constructionwork, and further probes into the effect of tender sum limit and its profound theoreticalguidance. Based on the Game Theory and Information Asymmetry Theory, it firstly analyzesthe influence of tender sum limit upon contractors and the competition among contractors, which explains that the setting level of tender sum limit could improve competition and lessenthe negative impact of asymmetric information. Secondly it analyzes the tender sum limit, asone kind of contract-issuers price control strategies, constraining effect on contractorbehaviors, andprevents or adversely selects against moral risks by ascertaining the compilation level basedon the entrustment theory. Lastly it analyzes the influence of tender sum limit on thepreliminary contract as well as contract alteration, and researches the effectiveness of tendersum limit and the possibility of applying its tolerance rule and the principle of historicalinterpretation based on the Pre-contract Obligations Theory.Thirdly, combining above-mentioned theoretical analysis with Logistics warehousingcenter features, it makes an analysis of tender sum limit basis and compilation details insimilar projects, which comes to an instructive conclusion on compiling tender sum limit insimilar projects.Based on the above-mentioned research, it ascertains the secondary evaluation standardof compiled tender sum limit in one logistics and warehouse center. Combined with theweight assignment of each standard in one logistics and warehouse center, it calculates thecomprehensive weight specifically for each standard and draws out the reasonable range oftender sum limit in this project. Within such a range, it specifies the bill quantity compilation,project features description, conventional construction scheme, comprehensive unit pricesettlement and other detailed works in this compilation process of tender sum limit.
Keywords/Search Tags:Logistics Warehousing Center, Tender Sum Limit, Compition Improve, BehaviorConstraint, Pre-contract Obligation
PDF Full Text Request
Related items