Research On The Trigger Condition Of Renegotiation In Urban Infrastructure PPP Project

Posted on:2016-11-13Degree:MasterType:Thesis
Country:ChinaCandidate:Z XuFull Text:PDF
GTID:2309330461986875Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
Along with Chinese government vigorously promote and support t PPP projects, PPP will usher in a new round of upsurge, and attract attention of more and more scholars.Although many infrastructure PPP projects are successful in our country, but PPP exposed the problems in practice, such as the uniqueness of project, legal changes, public opposition, etc.,the reason is that city infrastructure PPP project generally belong to large projects, its cycle is long, public or private contract signed by both parties is difficult to solve all the problems in the process of project implementation, That is to say, when some problem or dispute happens,the initial contract signed by both sides is very difficult to deal with these problems effectively,to renegotiate the problem has been reflected. To renegotiate in urban infrastructure PPP project has become the norm, and frequently. Renegotiation will affect the efficiency of the PPP. In this paper, through case analysis, we will study PPP project renegotiation trigger events and trigger points, the main content of the study are as follows:First of all, based on the public goods theory and project distinguish theory, we determine the application scope in the urban infrastructure PPP mode; From two aspects of the research content and method of the PPP projects, we analyze the incomplete contract renegotiation at present research, and the few studies the PPP project renegotiation trigger problems; Through the literature review of case study method, determines the application of process the case study method.Secondly, this paper summarizes the PPP project renegotiation trigger events, analyzes the renegotiation trigger point. In case analysis, from political environment, economic environment, social environment and technical environment changes four angle analysis of the PPP projects in the operations possible renegotiation of the change of the objective environment through the PEST analysis, and then this paper has concise summary in each case to renegotiate. Analysis on exception. By putting a renegotiation events of individual case analysis and intersection of the PPP project renegotiation again triggering events.Comparative analysis of the trigger point through the renegotiation, trigger points can be classified into standard legal changes, force majeure, fare adjustment and the continued downturn in four aspects.Finally, combining the example analysis the preset of renegotiation of trigger mechanism.This paper study how these terms and conditions of the preset renegotiation of trigger mechanism, and find the preset trigger and trigger point of renegotiation, in order to provide a reference for the urban infrastructure project which will adopt PPP mode of the construction when signing the franchise agreement, through the analysis of Beijing metro line 4 franchise agreement about the law, force majeure, standard fare adjustment and change the terms of the continued downturn in four aspects.
Keywords/Search Tags:Urban Infrastructure, Renegotiation of PPP Projects, Trigger Event, Trigger Point
PDF Full Text Request
Related items