Font Size: a A A

The Management Mode Research Of Hailar-tarim Oilfield Exploration And Development Integration

Posted on:2013-08-15Degree:MasterType:Thesis
Country:ChinaCandidate:K L XiaFull Text:PDF
GTID:2309330452963005Subject:Business Administration
Abstract/Summary:PDF Full Text Request
As the nation’s largest oil field, Daqing oilfield production has been from27consecutive years and50000000tons of peak to yield by stage, at present alreadyin an annual output of40000000tons of step and maintained for8years. InLamadian, Saertu Xingshugang oilfield, the main late high water cut stage,output falls considerably under the big background, the production rate ofperipheral oil fields in Daqing oil field40000000tons productivity plays acrucial role replacement.Hailar-Tarim oilfild is the most important peripheral production replacementzone of Daqing oil field,40000000tons of crude oil production is the importantpart and strong support. In order to speed up the pace of Daqing oil fieldproduction, in2001organized on the sea-the tower of oilfield exploration anddevelopment. Early in the traditional battle, oil exploration, development andindependent operation of the oil field exploitation mode actively seekingproduction, although obtained certain result, but in system and mechanism,structure model, management procedure, process smooth degree and otheraspects remain to be further breakthrough, in order to more greatly accelerate thepace of production. It is in this context, in recent years in the oil industry toactively promote the integration of exploration and development mode in Daqingoil field vision, and the establishment of the Hailar-Tarim commandcomprehensive in-depth discussion of integration management mode, designed tofocus from exploration to development gives priority to change, in strengtheningthe exploration accelerates the pace of production, in the rolling development atthe same time to expand exploration, exploration, development andimplementation.In order to further promote the Hailar-Tarim oilfield management patternresearch and upgrading, based on the integration of exploration and developmentthe basic theories and the domestic and international implementation of thesystem of oil field as an example based on the integration of exploration anddevelopment, the main influence factors, system operation and practice shouldpay attention to the problem areas, in-depth analysis, and summed up the exploration development of the integrated operation of the core, running basis,operation security and support; According to the Hailar-Tarim geologicalresources survey, development situation and organization profiles, detailedanalysis of active exploration, development and current organization andoperation mechanism, put forward the existing external coordination isinsufficient, excessive internal management level, exploration and developmentaspects of communication and coordination as well as poor operation and theoperating system market shortage etc. aspects of the problem; Through theselection and application of the domestic implementation of the integration ofexploration and development of the typical oil field were analyzed, combinedwith the Hailar-Tarim oilfield is actual condition, from the authorities to grass,from domestic to foreign countries, from system to system, from system toprocess, restructure, which set up the Hailar-Tarim features, to battle need, hasstrong application the exploration and development integration managementmodel; Put forward to perfect the function of evaluation system, perfect marketrelated policies, enhance employment policy, increase the flexibility of earthlyenvironmental protection work coordination efforts and strengthen the businessoperation of five security measures, in order to Hailar-Tarim oilfield reform themanagement mode, realize rapid production target to play a useful reference andpositive role.
Keywords/Search Tags:Hailar-Tarim oilfield, integration of exploration and development, development model
PDF Full Text Request
Related items