Font Size: a A A

Research Of FHDH Company To Shorten The Production Cycle Of The Products Of R

Posted on:2015-06-22Degree:MasterType:Thesis
Country:ChinaCandidate:G Z GuoFull Text:PDF
GTID:2309330452460486Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
In the21st century, with China’s accession to WTO, China is facing fierce competition inthe market challenges of globalization, the increasing competition in the market relentlesslypromote the enterprises to continue to pursue high-quality, low-cost and fast response. Marketfrom a seller’s to a buyer’s market, the shift from large quantities of product sales model intomany varieties of small quantities of customer demand-pull mode, the customer expectedproduct life cycles are getting shorter and customers want to be able to get personalizedservice, and accordingly requires companies to have a more flexible manufacturing systems.Customers concerned on the basis of high quality and low price, but also increasing emphasison delivery. Peer competition, the delivery time to become a recognized supplier proportionthreshold increases, more cases delivery is one of the factors determine corporate customerorders quota size. Shorter delivery become more market share in a competitive advantage.Currently, advanced lean production theory are increasingly widely used, such as: abalanced production, JIT, fast switching unit, production over the same period of theorieshave been or are being guided many companies manufacturing practices. The purpose of leanproduction is to eliminate non-value added activities of production among its core philosophyis only valuable work.Growing trend in the market tend to breed in small quantities at high-quality, shortdelivery of new competition and FHDH company’s current delivery requirements than thecustomer delivery long double background, FHDH company to shorten the production cycleR were aspects of research, mainly from fast switching, production volume improvement andin-depth analysis of three aspects of a balanced production, find out the current fast switching,production volume and equalization manage some of the problems, and then solve theseproblems, the application of scientific production management theories and methods toimprove this research.Delivery is mentioned in this article the production cycle, production cycle is obtainedfrom the raw materials to the time of manufactured goods. Production cycle includes theprocessing time, waiting time, time handling and inspection time.Production volume decrease is mainly single batch feeding amount, thereby reducingproduction volume caused by latency. Rapid switching of the main line and the line is thedistinction between outside activities, thus shortening the time to switch batches. Balancedproduction of research to develop the key process bottleneck output targets for each model,thereby reducing the excessive production of the product backlog occurs.
Keywords/Search Tags:production cycle, Lead, Fast switching, Equalization, Small quantities, SMED
PDF Full Text Request
Related items