Font Size: a A A

Study On The Operation Mechanism Construction Between General Contracting Enterprises And Labor Subcontracting Enterprises

Posted on:2015-01-06Degree:MasterType:Thesis
Country:ChinaCandidate:W T ZhouFull Text:PDF
GTID:2309330431497406Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
In the construction engineering materials, in addition to the subcontractor for the biggestproportion. The construction labor subcontracting proportion in the second. While theconstruction labor subcontracting work involves a relatively sensitive "migrant workers"problem. Therefore, how to solve the problem of building engineering construction laborsubcontracting mechanism,is always the key link in our construction industry concern.In this paper, through the analysis of the current labor causes package problems,combined with China’s construction service development package,and all of the constructionservice solution package problem, proposed the present stage domestic construction laborsubcontractor performance process has not been an effective supervision and restraint, laborsubcontracting model lacks a sound contract management, labor worker mobility is too large,the construction general contracting enterprises lack of labor and employment managementawareness, the construction labor subcontracting bidding system lack, enterprise funds chainsubcontracting services such as China’s construction industry a series of problems.Thesis from the construction labor subcontracting mechanism construction problems arediscussed, with the total contract construction enterprises and construction services sub gameequilibrium bag enterprise interests as the starting point. After the establishment of both sidesin different mode of cooperation of cost-benefit model, explore the cost benefit equilibrium ofcontract firms and labor subcontracting enterprises, and through the method of balancingvarious illegal labor on both sides of the rent-seeking problem solving. Bidding mechanismthis paper innovatively introduced by government supervision of construction laborsubcontracting, and the establishment of expected utility model, the government interventionand the illegal violation penalty P probability theta, decided to labor cooperation cooperationmode and management mode of choice. This paper further proposed the establishment of theoperation mechanism of the construction labor market,and create an orderly labor marketmeasures; government guide the bidding mechanism is involved in the construction laborsubcontracting mode, form the effective government supervision; encourage local laborreduce the flow of migrant workers consumption; establish professional occupationqualification certification and authentication service system, and change the occupationtechnical school the concept of the training, standardize and improve the operationmechanism of total contract construction enterprise in our country and labor subcontractingenterprises.
Keywords/Search Tags:Labor Subcontracting, Operation Mechanism, The Cost-IncomeModel, Expected Utility
PDF Full Text Request
Related items