Font Size: a A A

Research On The Project Management Of The Sinotruk X Automotive Stamping Dies

Posted on:2014-03-08Degree:MasterType:Thesis
Country:ChinaCandidate:J S DongFull Text:PDF
GTID:2309330428979116Subject:Project management
Abstract/Summary:PDF Full Text Request
Automotive cold stamping dies is the important equipment which used by the press shop of automobile factory to produce body parts of auto. And stamping holds the first place of the four manufacturing process, it decides the quality of welding and final assembly, also the appearance quality and assembly quality, even effect on the safety performance of the whole car. There are many domestic automotive stamping die suppliers at present and got fierce market competition. In order to meet the requirement of the car manufacture that they need much shorter developing period, better quality and lower cost for the new models. The die suppliers try their best to improve the technology and production capacity. Business outsourcing, finding a cooperation factory is the management mode which generally recognized as a good method to reduce the capacity stress. This article is about how the business outsourcing can be normalized and institutionalized to bring the three win effect of automobile factory, die manufacture and outsourcing plant.Connected with the author’s actual outsourcing working experience in the project with sinotruk, using the project management theory and method to discuss the project scope management, organizational management, bidding and tendering management, plan management, quality control, communication management, change management and risk management in outsourcing business. This article is majored in discussing process control, and the key concept is the PDCA cycle of Plan, Do, Check and Action, attempting to find a method to normalize and institutionalize the outsourcing business.The large stamping dies’ outsourcing management involves a series of complicated managing processes, the managers should focus on the point. There are three key points of the management:supplier and bidding and tendering management, plan management, quality control. There will not get big risk if we’ ve implement the effective control for the implementor and implementation process. Other management is also important, it supports the realization of the three targets above. Hope the method and conclusion can be used for reference and operation for outsourcing business of large automotive stamping die enterprise.
Keywords/Search Tags:stamping dies, outsourcing business, process control
PDF Full Text Request
Related items