Font Size: a A A

Country Construction Management Research Of Immigrant New Town In Kaixian

Posted on:2015-07-05Degree:MasterType:Thesis
Country:ChinaCandidate:S Y ChenFull Text:PDF
GTID:2309330422472432Subject:Administrative Management
Abstract/Summary:PDF Full Text Request
The Three Gorges Project attract worldwide attention, attention to the ThreeGorges immigrant men. To1992, the five National People’s Congress through the"construction of the Three Gorges Project on the resolution", the construction of theThree Gorges Dam on the agenda. The key to success lies in the Three Gorges ProjectImmigration, from the central to local governments have attached great importance to.Reservoir resettlement is the focus of the new town, so how to implement the plan andhow to carry on the management to the relocation of Metro is a key problem for thegovernment to face. In view of the Three Gorges project is a large-scale waterconservancy project human There was no parallel in history., reservoir city relocationinvolves vast, complex and far-reaching impact, this is a challenge for the reservoir areaof city management and development, but also to promote the theory and practice of therare opportunities of development.The author in guiding the subject system of public management science,integrating economic and Environmental Sciences, Kaixian Metro is typical ofReservoir Emigration city management, investigation, analysis, comparison, induction,summary, and to explore the Kaixian Metro and metro in the reservoir physicalproblems in the city management, and puts forward the measures and suggestions thecorresponding.Should see, city management area is a comprehensive problem, analyzes the basicproblems of traffic crush one by one, industrial park management and the managementof the whole city, coordinating the development of metro, unremittingly to solve everyproblem of link, create a beautiful, livable, sustainable development of city.This paper is divided into five parts:The first part is the introduction, research background, significance of the thesis,domestic and foreign review, methods, and difficulties and innovations.The second part is the basic theory part of the thesis, including the definition of theconcept and the general situation of reservoir area (covering the Kaixian Metrointroduction). This part of content can be obtained by referring to the historical data.The third part is the research part of the thesis, through on-the-spot investigation,Kaixian city government to visit, a large collection of relevant data, by SWOT methodat first summarized the development of the Kaixian City, and then analyzes the metro in the presence of these three traffic management, water treatment, industrial parkmanagement is part of the problem, and give the reasonable suggestions andcountermeasures. This part includes third chapters, four or five, six.The fourth part is the summary of the whole thesis.
Keywords/Search Tags:Immigrants, removal New City, City Management, Countermeasures
PDF Full Text Request
Related items