Font Size: a A A

Research On Bidding Decision Model Of Construction Project Invested By Government

Posted on:2014-05-31Degree:MasterType:Thesis
Country:ChinaCandidate:B X ZhangFull Text:PDF
GTID:2309330422468823Subject:Project management
Abstract/Summary:
Since the reform and opening policy, Chinese economic has made greatachievement in the world. Government-invested projects play a leading role in themacro investment activities. Scientific of bid progress directly affects the success ofthe whole project in government-invested project.Combined with my practice, in-depth, systematic analysis and decision-makingresearch had been conducted. This paper deeply analyzed and systematically studiedthe content, characteristics and working procedures of government invested projects.Besides, its advantages and disadvantages as well as its usable range were analyzed.Based on the deep analysis of the principle and methods about evaluation indexsystem and weight allocation, an evaluation index system of government investedprojects was developed. At the same time, AHP and Fussy were used to solve theweight allocation and fuzziness of bidding decision, and those are composed intodecision-making model for bid evaluation in engineering project. Finally, an empiricalresearch was conducted based on the methods we developed in this paper.This study aims to point out problems of bidding progress, hoping to providereferences for bidding by build the decision-making model for bid evaluation inengineering project and using the method of case study.
Keywords/Search Tags:Government-invested projects, Bidding decision model, Fuzzycomprehensive evaluation
Related items