Font Size: a A A

The Planning Study Of Guangzhou Port X Terminal PhaseⅡ

Posted on:2013-05-31Degree:MasterType:Thesis
Country:ChinaCandidate:W J ZhuFull Text:PDF
GTID:2309330395975598Subject:Logistics Engineering
Abstract/Summary:PDF Full Text Request
《Pearl River Delta reform and development plan》put forward clearly to focus on thefuture development of Guangzhou port, Guangzhou to strengthen national center city status.Due to the port and port economy in the country the functional position of center city.Construction of international shipping center in Guangzhou will be construction of nationalcentral city functions and tasks. The government puts forward clearly Guangzhou port thenext step is to: Development of the modern shipping service industry and modern portlogistics, Efforts to build national center city matching,to Hongkong dislocation developmentof international shipping center. In order to construct the Guangzhou city modern deepwaterport, Guangzhou port development plan main train of thought is to pass construction andtransformation, adjustment of haven function layout, reform the management system, theestablishment of modern enterprise system, the production and operation of the round to themarket, participate in competition actively, key to improve to meet market requirements ofthe handling capacity of haven, increase investment in science and technology andinformationalization the establishment of the port, international information network center,actively promote the port logistics park’s construction, form haven function, layout andtransportation capacity to adapt to the development of the national economy, and advancedtechnology, high quality services for the modernization, internationalization, information andintegrated port.Guangzhou port X port is on the South of China, located in Ocean Shores lions, locatedin Dongguan, close to Guangzhou, west of lianhua mountain, and the Guangzhou economicand Technological Development Zone, high-tech development zone and the bonded area in anarrow strip of water, first project has been completed and1035000tons deep-water berths,in order to meet the needs of the Southern China economy to accelerate development, X portset aside more than30deep-water berths development space. At present,10berths includingthree coal berth, bulk grain berth car Ro-Ro terminal berth,two general berth, used the mostadvanced machinery and equipments in the international.In this paper, research work is mainly divided into two parts: first, through to the X portstatus of the future port development scale analysis, pointed out that the current problems;second, according to the X port actual throughput and economic hinterland to port resourceneeds, use mathematical model to the X port throughput development trend analysis andforecast. In considering the X port terminals existing maximum production capacity and the Xport resources and how to make rational use of the premise, research in terminal two period construction planning, in addition to the port of Guangzhou natural conditions includingweather, wind, rain and fog, flow, wave, channel depth of water, anchorage, handlingtechnology and so on, to ensure the study on the sustainable development of the port of Xwith practical guidance.
Keywords/Search Tags:Pearl River Delta planning, Port planning, Wharf construction
PDF Full Text Request
Related items