Font Size: a A A

Design And Implementation Of Whole Journey Track Management System Of Construction Land In Jining City

Posted on:2015-05-30Degree:MasterType:Thesis
Country:ChinaCandidate:S Q ChenFull Text:PDF
GTID:2308330461492521Subject:Software engineering
Abstract/Summary:PDF Full Text Request
This article from the Jining city construction in the importance of the real estate market and stable development of the land, the contradiction between land supply and demand situation and the market for starting, puts forward the necessity to establish the construction of object oriented land tracking management system;construction situation of land information system, to explore the development of domestic tracking management information system and the existing problems,according to the Jining Municipal Bureau of land and resources of existingconstruction land information system, puts forward the research content, the goal of this paper, the problems to be solved. The article from the system developmentbackground, the significance of business requirement analysis and overall scheme, system design, system implementation and other aspects.Jining city construction land all process tracking management system is designed and developed according to the Jining Municipal Bureau of land and resourcesrequirements, the development process of the system using object-oriented design idea carries on the analysis to the system demand, the system each function ofobject-oriented design, ultimately achieve the desired design goals. The system uses the J2EE structure, using Tomcat as the WEB server, using SQLSERVER2008 as the database server, multilayer architecture design for the system by using the MVC design pattern, the system made a good extensibility and maintainability of the information management system.Based on investigation, through system flow diagram, use case diagram and the use case description way of demand to the function of the system are analyzed and described; completed the overall framework of the system outline design andsystem design, and system functions carried out a detailed design through the class diagram and sequence diagram; system realizes the land sourcemanagement, supply planning management, land reserve management, bulletin management, clinch a deal for publicity, supply management, project supervision,the result of market management, two query statistics and system management functions. Indicates that the test run, the system basically meet the needs of users.Input and use the successful development of Jining city construction land tracking management system, effective implementation of Jining city construction landtracking supervision, carry on detailed statistics and analysis according to different stages of land, the full realization of without the syndrome, syndrome and not for,not, rather than the land of the tracking and supervision, in order to take use of thecity’s construction from the macro, can grasp the dynamics of each land use and disposal. Jining City Land Resources Bureau of land use in Jining city to providescientific decision-making basis.
Keywords/Search Tags:construction land, tracking, B/S architecture, Unified Modeling Language
PDF Full Text Request
Related items