Font Size: a A A

The Design And Implementation Of Enterprise Vacation Management System

Posted on:2015-06-10Degree:MasterType:Thesis
Country:ChinaCandidate:X F SongFull Text:PDF
GTID:2298330422477161Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Scientific and network management has gradually become every company’scorporate management goals. However, management on vacation, related to the vitalinterests of each employee, the development in information technology is still notenough. A large number of companies are still using paper-based documents forholiday-related management, although there are companies introduced a vacationmanagement system, but most of those systems are lack of function and manageflexibility. With constant improvement of the paid vacation policy of our Country,business demand for efficient and comprehensive vacation management system isbecoming more intense.Based on Achievo’s specific needs, combined with the advanced portion of themainstream of today’s management mode, this system proposed three characteristicmanagement models: holiday double entry configuration, application and attendancehedging and attendance recovery. Holiday double entry configuration includes globalconfiguration holiday vacation and personal custom configuration, making holidayarrangements fully digital. Not only achieve our company’s overall holidayarrangements, but also give special employees special "care", and achieve maximumflexibility finally. By comparing vacation request and attendance, you can implementa full range of audit information for staff attendance. For the time there are noattendance information for some employees, the system can determine whether it is anormal leave or not. If the status of attendance is abnormal, you can create a newrequest for attendance recovery. The system is based on ASP.NET framework, with the help of Browser Server, three-tier structure of ideas and software engineeringmethods, combined with Ajax, jQuery, LINQ, Unity Framework mature technologyfor development. The system be officially put into use on November2013in Achievo.After several months’ testing, the indicators have reached the expected requirements.
Keywords/Search Tags:Vacation Management, Attendance Comparison, Abnormalrecovery, .NET, B/S
PDF Full Text Request
Related items