Font Size: a A A

Post - Evaluation Theory And Case Analysis

Posted on:2015-07-03Degree:MasterType:Thesis
Country:ChinaCandidate:Y WangFull Text:PDF
GTID:2279330431476685Subject:Business administration
Abstract/Summary:PDF Full Text Request
The project post evaluation should start on-site investigation and collect the relevant data in the project decision, in the investment and construction completed and put into use or operation after a certain period of time, Comparing the "Project Feasibility Study Report,""Project Self Summary Evaluation Report " and approval documents. Follow the independent, fair,objective, scientific principles, implementation process, Survey researchand comprehensive systematic review project implementation process, result and influence. Comparison and analysis of the actual effect and project decision determine target technical,economic environmental and social indicators. Find out the gap and reason summarize the experience and lessons, inspiration, puts forward the corresponding countermeasures and suggestions, feedback information. In order to improve decision making, a new round of investment and project management, and constantly improve the investment decision-making level and investment benefit.The project post evaluation has been an important means of effective investment.a large number of engineering practice has proved, only do a good job of project post evaluation to ensure the timely detection of problems in the operation of the project process, and provide scientific basis for future investment decisions. But China is still in the its infancy, post project evaluation has not been fully appreciated, the national related policy is not perfect. The level is relatively backward. Definition of post evaluation also has certain problem. In the "Guide to evaluation of fixed assets investment projects of central enterprises",the project post evaluation is defined as a static evaluation, is the task of the operational phase of the project construction period. In fact, the project post evaluation should be a dynamic evaluation. It should start from decision-making, rather than after the completion of the project.In addition, the lack of professional evaluation in China, the backward methods such as reasons for restricting the development of the evaluation of the practice.Want to improve the level of project post evaluation in our country, one needs the support and participation of enterprises; The second is to train professional staff; The third is to establish an informationplatform for enterprise-wide. In this paper, by reviewing the development status and characteristic of the project post evaluation at home and abroad,analysis of the problems existing in the investment project evaluation in our country,which made research purposes and ideas of this article.For the definition of project post-evaluation, the basic content and basic theory has carried on the detailed elaboration, and proposed a method of post evaluation.On the basis of theoretical analysis, according to the collected data and field investigation, evaluation and analysis of "HYT" project.
Keywords/Search Tags:Postproject evaluation, Index system
PDF Full Text Request
Related items