Font Size: a A A

The Research On Risk Management Of H Scenic Spot Development Project

Posted on:2016-12-22Degree:MasterType:Thesis
Country:ChinaCandidate:J J ZhangFull Text:PDF
GTID:2272330488962689Subject:Project management
Abstract/Summary:PDF Full Text Request
Along with the improvement of consumption concept, life style and economic level, leisure tourism in China enter a new period. As a 5A level open scenic spot, H scenic spot have more challeges and chances.The risk management of scenic spot development project which has extremely complex features in market operation and organization management, is a risk management has important of significance.At present, China’s scenic spot development projects are in the early stages of development; poor project plan and the lack of awareness of project risk management still largely hindered the improvement of project management.This paper applies risk management theory and methods to specific project,and take the H scenic spot development project for the study. Firstly, the development of scenic spot project risk management of the overall summary, briefly discussed the background, purpose and the significance of the paper research. The study of domestic and foreign scenic spot project project risk management are summarized. The project risk management risk identification, and then into the project management of scenic spot development risk assessment and risk control. On the basis of various theories of scenic spot development project risk management, the background and characteristic of the scenic spot development project, screening of various risk factors may produce in the process of its development, a clear risk factors focused on risk management, in accordance with the relevant risk management theories were analyzed qualitatively and quantitatively, and the risk prevention and corresponding control measures according to the different levels of risk factors, with the minimum cost of the project to reduce the risk loss to the lowest limit.
Keywords/Search Tags:scenic spot development, project management, risk managment
PDF Full Text Request
Related items