Font Size: a A A

Study On Cost Management Of Greening Project Of Haqi Passenger Dedicated Line

Posted on:2017-01-05Degree:MasterType:Thesis
Country:ChinaCandidate:B C FengFull Text:PDF
GTID:2272330485988885Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of railway, especially the high-speed rail construction rapid development throughout the country, continuously shorten the transit time between cities, but also for high-speed lines on both sides of the green forest put forward higher request, not only should have the original snow, windbreak and sand-fixation based can shelter forest protection function, at the same time with shrubbery, combining with the landscape features, combined with the needle, the railway shelter belt became a scenery line, a subsidiary company of forestry department belongs to the rail, the railway on both sides of the green is productive task, and it’s not a for-profit business activities, along with the deepening reform of railway enterprise, now the railway become the subject of management workers wage income depends on the railway operating earnings, savings and income every penny and every worker’s salary is closely related, therefore, reduce waste, improve the utilization rate of cost is imperative, high-speed rail passenger dedicated line for Harbin to Qiqihar greening projects, we must introduce scientific cost management system, effective analysis of cost, find out the reason of cost savings and cost overruns, and put forward the way to further reduce costs and methods, cost reduction and efficiency for the enterprise, improve enterprise’s competitiveness.This paper studies the main content of each step of landscape engineering cost control measures to carry out the analysis and research:(1) Analyzed the current status of landscape engineering cost control, this paper expounds the problems existing in the landscape engineering cost control and characteristics, and analysis on the cause of the problem.(2) Put forward the improving haqi’s passenger dedicated line of landscape engineering cost control measures.(3) According to haqi’s passenger dedicated line of cost control measures formulated relevant safeguard measures.Through the above method in the application of Haqi passenger railway greening project research, cost control is the core of cost management, through a series of measures to early to mid design, the whole process of construction and tending management card has played a very good control effect.In addition, through a sound system of construction and examination assessment system can help management control measures of implementation, improve the level of enterprise cost management, and seek further way to reduce costs and methods, improve the economic benefits of enterprises.
Keywords/Search Tags:Passenger dedicated line, greening projects, cost control
PDF Full Text Request
Related items