| Project management activities carried out in the most basic work than the maximum workload cost control, which is also the most prone to problems, involving most of the most complicated aspects of an activity, often will bring a large number of projects various risks. Therefore, enhance the level of cost control efforts of this activity, on the one hand is to improve an important part of the project’s internal control system, on the other hand is the key to the project management level to get promoted, thus to effectively prevent and reduce engineering project management process issues that may arise, and there is a problem in the occasion of the project cost, can effectively help each party involved in the whole project to safeguard their legitimate rights and interests. Therefore, how effective project cost control, improve its entire process in every aspect, effectively raising the cost of the project that can control consciousness, it has become a project cost control system indispensable content.This article will examine the objects positioned to Chengmianle Pihe railway bridge project, first reviewed a series of cost control theory. After this places it as the basis of analysis of its cost management philosophy and anticipated goals and outlines its cost plan. Subsequently, the sub-process, in stages based on identifying material procurement cost control risk at this level, to form the corresponding model to assess the cost, and the introduction of a series of analytical methods in the meantime, the cost of evaluation in which each stage that may arise from the actual control risk cases reflect its cost control measures, and finally combined into management Chengmianle railway Pihe Bridge Project actual situation, clearly the cost control activities at different stages of the preparation of the construction process, and acceptance should be noted that a series of priority activities and the various methods to be taken, and the aid of a series of related specific case Chengmianle railway Pihe Bridge project demonstrates the corresponding activities of the project cost, and yo evaluations during the entire project cost control achieved The practical effect. Finally, the article summarizes the whole research work. |