In recent years, with the rapid development of the social and economic background, environmental problems have become increasingly prominent, and the problem of resource environment has become an important factor restricting the development of our society. Under this background, energy-saving and emission reduction has become an effective means of sustainable economic and social development, to improve the utilization of resources to achieve energy-saving and emission reduction is imperative.Our country is currently in the stage of developing the infrastructure construction, with the rapid development of highway construction, the highway continuously extends into the mountain areas, proportion of bridge and tunnel increases continuously. Tunnel is a special construction of the highway, it is the place where traffic jam and traffic accidents occur frequently, and the lighting is an important facility to adjust the intensity and uniformity of the light in the tunnel. It is an important guarantee for tunnel safety. However, the cost of lighting operation is huge, and the tunnel lighting energy saving has great potential. How to ensure the safe operation of the tunnel, we can reform tunnel lighting by means of project organization and management, and make sure the project completed on schedule, and finally achieve the purpose of tunnel lighting energy-saving, which is the main study topic of this paper.This paper takes the Guangxi hedu highway as an example for tunnel lighting energy saving transformation project, discusses the specific implementation of the transformation project. First, a brief description of the general situation of the project, choose and determine the tunnel lighting energy saving renovation program basing on the investigation, field measurement, and statistical analysis of data, and in the full understanding of the electrical properties of LED.Second, organizing energy saving reconstruction of tunnel lighting by project management methods. Discussion on the implementation process of the transformation project mainly from several aspects of the project organization model, project management plan, as well as project cost control, quality control, schedule control and safety management. Third, evaluation of the energy-saving effect of tunnel lighting energy saving renovation project. First through the method of comparison, qualitative analysis of the stability of the lighting system after the reform from the working state of the equipment and equipment intact rate; secondly, through the analysis of operation data after the transformation, It has a considerable economic benefits, environmental benefits and social benefits of energy saving reconstruction of tunnel lighting. Finally, summarize the full text.The tunnel lighting energy-saving projects actively response national energy-saving emission reduction policies, not only has a better energy saving effect, but provide reference and guidance for the organization and implementation of the highway. |