The Research On The Progress-control Of The Commercial Project Of Quancheng Impression

Posted on:2014-07-30Degree:MasterType:Thesis
Country:ChinaCandidate:B ZhangFull Text:PDF
GTID:2272330473954118Subject:Project management
Abstract/Summary:PDF Full Text Request
The schedule control of engineering construction project is an important part of project management, project implementation is expected return indispensable important content, therefore, to do a good job of schedule control engineering construction project has the very important practical significance.Springs impression business district is expected to start stop time is in May 2011 to October 2016, the project belongs to the work of construction project, therefore, the topic \"quancheng images\" commercial project progress control research is worth to study. Topic selection is based on the project schedule control theory, impression of city business district project schedule control is studied, the specific research results are as follows:First of all, studies the theoretical basis and realistic basis. On the one hand, by domestic and foreign research present situation and the development of the project schedule control dynamics for comb, theoretical basis to obtain research; On the other hand, through to the springs impression commercial field project and so on, understand the basic situation of the project, obtain the practical basis of the study;Secondly, according to the construction process of the springs impression commercial projects, through three steps, namely:project definition, project planning, project implementation and control of springs use impression downtown to measure progress of the project, to identify project risks at the same time, to obtain the specific situation of the construction of the project schedule, and put forward reasonable schedule on the basis of this control scheme;Again, from the concept level and technical level, system level, are implemented in jinan impression downtown measures for the control of the progress of the project schedule control plan. Specifically, on the surface of the LiNianCeng progress control measures including:set up the correct values of schedule control; Build the culture atmosphere of participation and schedule control. Technical progress control measures including:arrange schedule, improve the efficiency of the project; To enhance investment in scientific research, reduce the project progress for a long time. System level of schedule control measures include:reasonable arrangement of construction process and control work progress; Reasonable deployment of construction personnel, to promote direct human progress;Finally, the full text is summarized and the future. Throughout the full text, both between point and research method of the innovation, and there is insufficient and collection of data, as well as natural, makes the study of quancheng impression commercial project progress control, has the significant theory significance and practical significance, again there is a larger development space. Especially the earned value analysis method to track the project schedule, tracking progress by the graphic method and predict trend of application in the engineering construction progress measures of the project, is a typical theory is applied to the exploration of practice, though, many experts and scholars to apply this method in the process of engineering construction project schedule control, but, according to data shows, so complete application case does not appear, makes the topic \"quancheng images\" commercial project cost control research more meaningful and at the same time, provides the reference and basis for other related research.
Keywords/Search Tags:construction project, The project schedule, Schedule control
PDF Full Text Request
Related items