Font Size: a A A

Study On Traffic Organization Optimization Of CTC Section On Common Speed Railway Line

Posted on:2016-12-24Degree:MasterType:Thesis
Country:ChinaCandidate:W LinFull Text:PDF
GTID:2272330470961216Subject:Transportation engineering
Abstract/Summary:PDF Full Text Request
The Centralized Traffic Control after its birth, the railway significant downsizing to improve efficiency becomes possible, and can obviously improve the railway traffic safety and efficiency, so it has become one of the important means of the modernization of railway, has been widely used in our country. Our country has many common speed line application of the Centralized Traffic Control system, and according to the Centralized Traffic Control system, it has carried on the exploration to the common speed railway in the driving position setting and traffic organization change, realize the downsizing of a small amount of station traffic post, at the same time of common speed railway dispatching centralized section of the existing traffic organization mode has changed. The Nan Chang Railway Bureau as an example, the Centralized Traffic Control system in the application of common speed railway survey, from centralized dispatching system role play, sending and receiving trains, shunting operation, system security functions of the application analysis the scheduling centralized system in common speed railway applications exist. Comprehensive study of the decentralized and autonomous the Centralized Traffic Control system of the function of application and put forward the common speed railway dispatching centralized section of equipment support plan, traffic post optimization scheme, reception and departure of train operation optimization scheme, rational use of security features and how to make full use the Centralized Traffic Control system of common speed railway.
Keywords/Search Tags:Organization
PDF Full Text Request
Related items