Font Size: a A A

The Whole Process Of Quality Management Of Metal Supervision After The Heating Surface Tube Of CFB Boiler Exploded

Posted on:2016-11-19Degree:MasterType:Thesis
Country:ChinaCandidate:C GuoFull Text:PDF
GTID:2272330470471268Subject:Power engineering
Abstract/Summary:PDF Full Text Request
This paper according to the heating surface tube of CFB boiler exploded cause analysis、prevention and control measures、the importance of the whole process of quality mangement of metal supervision、the whole process of quality mangement of metal supervision before the heating surface tube of boiler overhauling、the whole process of quality mangement of metal supervision processing the heating surface tube of boiler overhauling、the whole process of quality mangement of metal supervision after the heating surface tube of boiler overhauling and the whole process of quality mangement of metal supervision in the boiler start-up processing to elaborate, through the investigation of the whole process of quality mangement in the domestic first-class CFB boiler power plant and communicating with experts of metal supervision in the domestic EPRI, to preparate the related measures、requirments and inspection records.Focus on the inspection requirements、the requirements of quality control and supervision management of the heating surface tube of boiler, on the basis of supervision account to implement the whole process of quality mangement of metal supervision processing the heating surface tube of boiler overhauling, responsibiliting to individual, to achieve "sanding principle",namely fixed、people and region, to streng the responsibility and sense of crisis of inspectors、inspection personnel and supervisitors, to detecate the defects of the heating surface tube of boiler timely, to be eliminated before the unit started, to control the accidents of the heating surface tube of boilerexploded at a minimum, to exmpate the equipment operation, so as to ensure the stability、security and economic operation of unit. The whole process of quality mangement of metal supervision after the heating surface tube of CFB boiler exploded is implementated and got good effects, hoping for to provide some reference and help to deal with similar defects for other plants.
Keywords/Search Tags:CFB boiler, metal supervision, the whole process of quality mangement, the heating surface tube of boiler, tube explosion
PDF Full Text Request
Related items