| In recent years, with continuous improvement in the legal construction of our countryand the accelerating urbanization construction, the demand of relocation and reconstructionof prison project is increasing. In non-operating government investment projects, the prisonproject and the project of general government investment have many common characteristics.However, because of the unique properties of prison project, it also exist many differences.On one hand, the purpose construction of prison is imprisoning and reforming criminalsaccording to the low. The requirement for confidentiality is significantly higher than theother construction projects. To maintaining the long-term stability of social order, whenconstruct the prison project, the unnecessary public information must be prevented on thecondition of guaranteeing the project quality and schedule. One the other hand, Due to theparticularity of the prison application, the requirements of the construction is also stricter. Sofor the construction unit which is lack of experience, the project is difficult. Based on theissues, the article deeply discusses the mode of prison project construction management,trying to putting forward some constructive suggestions on the choice of prison projectmanagement mode.The article expounds the background and significance of the prison project managementpattern research, and discusses the management pattern and the existing problems ofnon-operating government investment project in China. Bases on which, the article furtheranalysis the characteristics, types and related mechanism research of the agent constructionsystem under the non-operating government investment project management model. Andbased on the above theoretical research, the article discusses the current situation of themonitoring project management, defines the prison project, and argues the way ofmanagement and the advantages and disadvantages of our prison project constructionmanagement mode. At the same time, combining the empirical analysis of the reconstructionLiaoning province prison project, it points out some suggestions in the arear of prisonconstruction projects. Firstly, the design stage and construction stage should be isolated,which can ensure the confidentiality and the controllability of the project construction.Secondly, the arrangement that the agent unit is in charge of the organization andimplementation of the project construction phase, realize the Professional management, which effectively guarantee the project quality, the time control and the cost control.Meanwhile, separating the funds and construction management by the terms of the agencycontract prevent the investment risks effectively.Through the combination of the theory of the engineering construction project and theempirical research on the prison project management in our country, the article put forwardsome Suggestions to the project management of prison. Firstly, set up a whole processsupervision mechanism to ensure the confidentiality requirements and the actual demand ofthe investor. Secondly, realize the independence of the project design, which avoids theconstruction unit mastering all the information of the prison project, and at the same time,avoids the information asymmetry caused by the agent entrusted relations. Thirdly, throughclearing the rights and obligations under a construction contract, the rights, obligations andresponsibilities of the investors, operators and consumers are strictly defined. Fourthly, forman effective incentive mechanism. Using the cost plus compensation payment method toarouse the enthusiasm of construction unit. And improve the evaluation mechanism. Set upan evaluation system which including a multi-dimensional of quality, time limit and cost. |