Honggutan central area is the development of the new city center,planning todevelop into a new political center and business center. In recent years,the center ofHonggutan has developed rapidly,a large number of projects under construction,population has gradually migrated to the region,power load larger development spacein the future. But the110kilovoltage power grid structure is relatively weak, supplyreliability is not high,and as the future of nanchang political center position is notsuitable.According to the survey, in order to meet load growth Honggutan center needs,meet the110kilovoltage substation capacity balance,and release the pressure fromshajing transformer substation power supply, improves the reliability andeconomics of power supply. The new110kilovoltage transformer substation ofHonggutan is very necessary.This paper expounds the general situation of the power transmission andtransformation project overall design,focuses on the selection of primary andsecondary power system design, substation sites and line path. And energyconservation, environmental protection measures taken by the project wereanalyzed.The project in terms of economic or social point of view, are feasible.Finally, the author puts forward recommendations on grid construction according tothe overall plan Honggutan areas.
Keywords/Search Tags:Status quo, Necessity, Select, Analysis
PDF Full Text Request
Related items