Electrical Engineering Progress Control Research On Binhai World Trade&Wealth Center

Posted on:2015-05-04Degree:MasterType:Thesis
Country:ChinaCandidate:L T WangFull Text:PDF
GTID:2272330467950343Subject:Project management
Abstract/Summary:PDF Full Text Request
With the open and reform, China has achieved rapid development in construction industry.It is a long and complicated process of building of the office buildings, highways, Commercial houses and other construction projects. Because of the long duration and large investment, the schedule control in the entire project is highly related between the quality and the cost. For large public building electrical installation projects, in order to meet the schedule requirements and ensure the economic interest goals of the enterprise, progress control needs prepare a reasonable schedule and take proper method works,which is very important things that must be face. It has a very important significance.Basing on the progress preparation and progress control, this article takes the electrical engineering of Tianjin Binhai Fortune Plaza for example. Firstly, it discusses the principles and methods of the project planning and control in application of the construction process, analyzing the characteristics of electrical engineering and the problems in the process. With the use of the methods and theories of schedule management in the actual electrical engineering construction management, it breakdowns the structure of the electrical construction, and determines the relationship of the construction procedure relationship and the responsibilities of the allocated matrix. Using the network planning technology, it prepares the network diagram and Gantt charts of the construction schedule. Using the bar chart method, S-shaped curve comparison method for process control checks the progress and results analysis. Then it discusses how to implement the project schedule management objectives and should provide some assurance measures for goals. Finally according to the specific problems which are found in the electrical engineering progress during the actual construction, it analyzes them and proses the solutions.The progress of the project management is an important and indispensable part in the construction management, which plays a special importance role. By studying in this subject, this articles hope that on the one hand it can improve the understanding of myself on the progress control, on the other hand it can provide some substantive reference to the construction enterprises.
Keywords/Search Tags:schedule control, electrical engineering, work breakdown structure, barchart method, S-curve comparison method
PDF Full Text Request
Related items