Red River Power Plant Project Construction Cost Control Present Situation And Existing Problems Of The Research

Posted on:2016-02-06Degree:MasterType:Thesis
Country:ChinaCandidate:L ZhangFull Text:PDF
GTID:2272330467497879Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
With the global energy shortage, abnormal climate and environmental pollutionproblems have become increasingly prominent, the countries to strengthen to theattention and support the development of clean energy, nuclear power applicationsbecome a major bright spot clean energy field of the world, has experienced the crisisat the Fukushima nuclear plant, the global nuclear power has present a newdevelopment trend. Therefore, the urgent need to solve the nuclear power cost controlproblem caused the attention of whole society.Liaoning Hongyanhe Nuclear Power Plant is Chinese fifth commercial operationof nuclear power base, the project planning and construction of6million kilowattpressurized water reactor nuclear power group, the construction of4units of the firstphase of the project total investment of51950000000yuan. Capital projects by thecompletion of the project to raise price raise by20%, Liaoning Hongyanhe NuclearPower Co., Ltd. the three shareholders, China Guangdong Nuclear Power InvestmentCo., Ltd and Dalian Construction Investment Co in accordance with their respectiveproportion of capital contribution. These three companies according to45:45:10shares than invested.Existing problems: the extensive construction of universal. Construction ofbackward technology, low construction level of management, human resourcesoccupy a large quantity but low production efficiency, these are the maincharacteristics of extensive construction. Construction technology and managementlevel is low, directly affect the quality of the project, to make the building lifeshortened, at the same time the extensive construction way of material, energy andhuman resources, serious waste. The construction of nuclear power development inChina in recent2years is rapid, but to the transformation process of fine construction from the extensive construction has been relatively slow.To solve the problem:1, the source control, reduce production. Take theconstruction cycle of whole process management model. One is the elaborate designand construction, new technology and new process saving vigorously thedevelopment and promotion of energy-saving, the use of environmentally friendlybuilding materials, raw materials are reasonable, efficient to use, durable, and itsimpact on the natural environment is reduced to a minimum; two is the use ofrenewable resources, such as the wall with the recycled tires and iron alloy scrap,steel roof truss for material recovery, from the site on a board is the main raw materialfor polyethylene and broken wood sawdust plus20%, roof made using old newspaperand cardboard box.2, classification, recycling use. For in situ produced and shipped out of theconstruction waste, should carry out sorting, concentration, which can be recycled asthe raw material component separation processing recycle. For example, scrap steel,scrap iron, scrap wire and all kinds of scrap steel accessories such as metal, aftersorting, concentrated, re melted can made into various specifications of steel. Wastewood, wood chips can be used in the manufacture of various artificial boards. Wasteconcrete can be used for the production of block, paving brick lining, etc., so as torealize from "traditional model building materials--buildings--building rubbish" to"building materials----------the building construction waste recycled materials"recycling mode transformation.Aiming at the severe situation in our country at present, the energy shortage andenvironmental deterioration, we should start now, profound review resource wasteexisting in the process of the development of nuclear power, to improve therelationship between the healthy development of China’s nuclear power issues ofideological emphasis, go "the road of the development of less energy consumption,minimum environmental pollution", vigorously develop residential industrialization,vigorously promote the construction waste recycling, to minimize unnecessary wasteof resources and energy, reduce the construction industry in the development of theenvironmental and economic costs, real win-win to achieve environmental protectionand economic development "".
Keywords/Search Tags:power plant, cost control, lean management, risk management
PDF Full Text Request
Related items