Font Size: a A A

Research On The Process Management Of Shangtun Reservoir Reinforcement Project

Posted on:2011-12-18Degree:MasterType:Thesis
Country:ChinaCandidate:D TangFull Text:PDF
GTID:2272330467478953Subject:Project management
Abstract/Summary:PDF Full Text Request
September2007, declared by the Liaoning Provincial Department of Water Resources, Water Resources and Hydropower Research Institute identified that the law library in Shenyang City, County Shangtun Reservoir (the reservoir Shangtun reservoir yet) have a significant security risk. Reinforcement of the project is still through the consultation demonstrated that viable and approved project, and access to project preparation and implementation stages. Shangtun reservoir management for owners, have set up yet Reinforcement of project headquarters, the project’s implementation date is September2009to December2010. This project management based on the theory of Reinforcement of the project is still in the process of management to start a more systematic research.Paper is divided into seven chapters, Chapter1introduction; the main problem described proposed research methods, the paper’s main content. Chapter2outlines the basic theory of project management, including project management, content, project management, content management, process models; this is the theoretical basis for this article. Chapter3focuses on the necessity and feasibility of the project started. Chapter4described the Reinforcement of the project is still the plan, yet the main contents include items Reinforcement of program objectives, program scope, schedule, quality planning, human resource planning, Main construction machinery equipment planning, security plans and plan changes. Chapter5elaborated yet Reinforcement of implementation of the project, mainly from the project, the quality, cost, human resources, the major construction machinery and equipment configuration, security and other aspects of the Reinforcement of the project is still of implementation. Chapter6described the project still Reinforcement of the control, mainly from the project, the quality, cost, human resources, the major construction machinery and equipment configuration, security and other aspects of the Reinforcement of the project is still control. Chapter7is the conclusions of this article.
Keywords/Search Tags:project management, reinforcement, project start, project planning, project implementation, project control
PDF Full Text Request
Related items