This topic research mainly based on each port company existing conditions,Tianjin port power system’normal load and installed capacity, refer to some foreignadvanced terminal implementation of shore power technology data; By investigatingthe last two years, the number of Tianjin port terminal port ship with differentproperties, different types of port ship generator installed sets and similar ratedcapacity and the known form of power, to estimate the specific port ship to shorepower demand. For Tianjin port ship or move of shore power technical analysis;Through different terminal implementation of shore power initial project investmentestimation, statistical or move on fuel consumption and the port of ship shore powerelectricity cost comparison, analysis of ship or move shore power static investmentpayback period, judge the economical performance of the implementation of shipshore power system, and finally come to Tianjin port recently enacted ship or moveshore power, the feasibility and implementation steps.This paper mainly studies the Tianjin port carrys out shore power system’sfeasibility. After implementing ship shore power system at the same time, the powersupply system adjustment do guidance note in Tianjin port. This research, technicalsupport to the projects of Tianjin port for future implementation of shore power,power supply system for port power distribution, load adjustment and subsequentpower planning play a guiding role. |