| The interests of a project and an entire enterprise survival protection need by Scientific management methods. Well-organized management methods, which can be set from the intangible good corporate reputation. How can I do construction companies do scientific management, multi-project management model gives the answer,multi-project management of Dr..Michael through the construction enterprise management analysis, combined with construction companies and construction project management status, roles and responsibilities, to achieve the desired results provide a set of scientific management methods, the construction company is divided into " project operations center "and" integration of resources deployment center "on the project and resource unified scheduling. KMYJ company own characteristics and combining multi-project management, multi-project management unit will be divided into high-rise construction specifically for multi-project management unit, high-rise construction of multi-project management department, municipal water supply and drainage of multi-project management department. KMYJ through the analysis of patterns of multi-project management as well as the whole environment is currently under construction enterprise project management comparison. Felt that the current single project management model, which restricts the ability of the enterprise construction, project management capabilities and enhance the core competitiveness of enterprises, and construction business management five elements differ. It must be an existing single integrated project management system reform, according to the characteristics of the project, project management system will be merged into a single multi-project management system, this multi-project implementation in KMYJ company, fully reflects the value of the company, and has made corresponding practical effect. In construction engineering experience of Summary multi-project management, construction management improve the level of universal value and significance. |